![Unigas PBY1025 Manual Of Installation - Use - Maintenance Download Page 106](http://html1.mh-extra.com/html/unigas/pby1025/pby1025_manual-of-installation-use-maintenance_4034727106.webp)
Connections from terminal side :
24V AC
Probe connection:
input
AI1
= probe
Pb1
= set-point “
tr
” = oil heater temperature probe;
input
AI2
= probe
Pb2
= set-point “
tCI
” = plant consent temperature probe (when installed);
input
AI3
= probe
Pb3
= set-point “
OIL
” = oil heater output temperature probe (PID regulation);
input
AI4
= probe
Pb4
= set-point “
tcn
” = oil heater consent temperature probe.
Pb3
Pb4
Pb1
COD. M12924CA Rel. 0.5 03/2016
Summary of Contents for PBY1025
Page 40: ...C I B UNIGAS M039126CE 40...
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ......
Page 81: ...RWF55 5X RWF55 6X User manual M12926CA Rel 0 2 11 2023...
Page 82: ...2 DEVICE INSTALLATION Fixing system Drilling dimensions...
Page 103: ......
Page 104: ...23 Note Specifications and data subject to change Errors and omissions excepted...
Page 113: ......
Page 114: ......
Page 115: ......
Page 116: ......
Page 117: ......
Page 118: ......
Page 119: ......