PART I: SPECIFICATIONS
20
Adjustments - brief description
The air and fuel rates adjustments must be performed at the maximum ouptput first (“high flame”): see the LMV5.. related manual..
Check that the combustion parameters are in the suggested limits.
Check the flow rate measuring it on the counter or, if it was not possible, verifying the combustion head pressure by means of a dif-
ferential pressure gauge, as described on par. “Measuring the gas pressure in the combustion head”.
Then, adjust the combustion values by setting the “gas/air” ratio” curvepoints (see the LMV5.. related manual).
Set, now, the low flame output, in order to avoid the low flame output increasing too much or that the flues temperature gets too low
to cause condensation in the chimney.
AIR FLOW AND FUEL ADJUSTMENT
(First) Start-up preliminary operations - gas supply
Recommended actions to be carried out in sequence:
1
Check the burner and all its components are installed correctly
2
Check that all electrical and mechanical parts are connected correctly
3
Check that there is water or other vector fluids in the generator
4
Check that the ventilation gates/dampers in the plant are open and the stack is free
5
Connect the gauges used to adjust and check pressures on the incoming line and on the head, air and fuel side.
6
Open the thermostatic series and the safety chain
7
Turn the main switch on the panel front with the "ON/OFF" selector to position "ON".
8
Check the phase and neutral position is correct
9
Open the manual shut-off valves slowly, in order to prevent any water hammers that might seriously damage valves and pressure
regulator
10 Check the sense of rotation of the electrical motors
11 Bleed the line, getting rid of all the air in the pipe as far as the main gas valve
12 Ensure the pressure entering the main valves is not excessive due to damage to or wrong adjustment of the line pressure regulator
13 Ensure the gas supply minimum pressure is at least equal to the pressure required by the pressure curves - burnt gas flow
Start-up procedure
1
Turn the burner on.
2
the LMV control box starts the system test cycle: the AZL display shows the
System Test
message; at the end of the test, it shows
the main page and the system stops (the safety chain is open) waiting for the startup enabling signal (standby - Program phase no.
12)
WARNING! During commissioning operations, do not let the burner operate with insufficient air flow (danger of
formation of carbon monoxide); if this should happen, make the fuel decrease slowly until the normal combustion
values are achieved.
WARNING! the combustion air excess must be adjusted according to the values in the following chart.
Recommended combustion parameters
Fuel
Recommended (%) CO
2
Recommended (%) O
2
Natural gas
9,0 ÷ 10
3,0 ÷ 4,8
DANGER! Venting the air from the piping must take place in safe conditions, avoiding dangerous concentrations
of fuel in the rooms. You must therefore ventilate the rooms and wait long enough for the gases to dissipate out-
side before switching on.
Setpoint
80°C
Act.value
78°C
Fuel
GAS
Standby
12
Summary of Contents for P60 VS
Page 45: ...Service manual Siemens LMV 5x M12920CB Rev 1 08 2009...
Page 46: ......
Page 93: ......
Page 94: ......
Page 95: ......
Page 97: ...User manual Siemens LMV 5x M12914CA Rev 0 03 2008...
Page 98: ......
Page 109: ......
Page 110: ......
Page 111: ......
Page 114: ...Annex1 Example for motor cable...
Page 115: ......
Page 116: ...Annex 2 Example for sensor cable...
Page 117: ......
Page 118: ......
Page 122: ......