PART III: OPERATION
37
MultiBloc MBE
Key
1 Electrical connection for valves
2 Operation display (optional)
3 Pressure governor closing tap
4 Start setting cap
5 Hydraulic brake and rate regulator
6 Coil
7 Test point connection G 1/8
8 Test point connection G 1/8 downstream of valve 1, on both sides
9
Output flange
10 Test point connection M4 downstream of valve 2
11 Gas flow direction
12 Test connection G 1/8 downstream of valve 1, on both sides
13 Vent nozzle pressure regulator
14 Filter (below cover)
15 Input flange
17 Pressure switch
18 Pressure switch electric connection
5
6
7
8
9
12
11
10
11
5
11
5
7
11
13
15
7
17
18
1
2
3
4
14
Summary of Contents for K590X
Page 49: ...Service manual AZL2x LMV2x 3x Burner Management System M12916CD Rev 3 4 03 2023...
Page 56: ...8 Parameters level heating engineer...
Page 98: ...50 ERROR CODE TABLE...
Page 99: ...51...
Page 100: ...52...
Page 101: ...53...
Page 102: ...54...
Page 103: ...55...
Page 104: ...56...
Page 105: ...57...
Page 106: ...58...
Page 107: ...59...
Page 108: ...60...
Page 109: ...61...
Page 110: ...62...
Page 111: ...63...
Page 112: ...64...
Page 117: ......
Page 118: ......
Page 119: ......