DK
38 MATLINE | UK
UK
2
6
Drawing of specific pipe
installation (wall thickness
400 mm
& door opening 1,010 mm)
Mark position of recess in the
concrete
(width 1,250 mm and depth
1,000 mm)
7
Lay iron mesh and underfloor
heating pipes
3
8
Insulate terrain deck in
accordance with applicable
building regulations
Before moulding the concrete
deck, fit a wooden box (width
125 cm x depth 100 cm) into
the insulation material
1
5
4
110 mm P-trap in position in
the ground
The final height of the sewer
pipe is measured at 50 mm
under the final concrete
surface
Insert the shortened pipe
into the P-trap
50 mm
1250 m
m
1000
m
m