40 MATLINE | UK
UK
10
14
Place the protective foam
block (supplied) in the basin
until installation is complete
Spread concrete under the
MatLine drain
11
15
Fit the MatLine frame just
before tiling
Fit the MatLine system onto
the sewer pipe and press into
the concrete
12
16
To ensure that the frame is
flush with the finished tiles,
use distance blocks to adjust
frame height (min-max: 8 -25
mm)
The top of the unit should
be flush with the moulded
concrete deck
9
13
When the MatLine unit is
positioned correctly, mould
concrete around it
Concrete deck moulded
around the recess
17
(25 mm)
example: 4 mm / (12 mm)
(12 mm)
(15 mm)
(12 mm)
(10 mm)
7 mm
4 mm
4 mm
2 mm