17
Tec
hnical f
eatures and dimensions
ATTENTION!
In rooms with the presence of aggressive
vapours or dust, the appliance must operate
independently from the air inside the instal-
lation room!
ATTENTION!
The appliance must be installed by a qualified
technician with the technical-professional
requirements according to law 46/90 which,
under his own responsibility, guarantees
compliance with standards according to
good practice rules.
ATTENTION!
Mount the appliance respecting the minimum
distances required for installation and main-
tenance.
The boiler must be connected to a heating
system compatible with its performance and
output.
3.2 - INSTALLATION STANDARDS
It must be installed by a professionally qualified technician,
who
shall take the responsibility of observing all local and/or
national laws published in the official journal, as well as
applicable technical standards.
3.3 - INSTALLATION ON
OLD OR RETROFITTABLE SYSTEMS
Before installing this appliance on old systems, check that:
- The flue is able to withstand the temperature generated by
the combustion products, has been measured and designed
according to the regulations in force, is airtight and insulated,
and does not feature obstructions or constrictions.
- The flue has a device for releasing condensation.
- The electrical system has been set up by a qualified techni-
cian in compliance with the rules in force.
- The rate, head and direction of the flow of the circulation
pumps are appropriate.
- The expansion vessel(s) can fully absorb dilation of the flu-
id in the system.
- The fuel adduction line and the tank, if any, are made ac-
cording to relevant standards in force.
- The expansion vessels can fully absorb dilation of the fluid
in the system.
- The system has been cleaned and cleared of all sludge
and scale, has been vented, and all its seals have been
checked.
- There is a treatment system for feed/recirculation water
(see reference values).
3
INSTRUCTIONS FOR
INSTALLATION
3.1 - GENERAL WARNINGS
ATTENTION!
This boiler is intended solely for the use for
which it was expressly designed. Any other
use is to be considered improper and there-
fore dangerous.
This boiler heats water at a temperature
lower than the atmospheric pressure boiling
temperature.
Before connecting the boiler, have professionally
qualified personnel:
a) Thoroughly wash all the piping of the system
to remove any residues or impurities which
could jeopardise proper operation of the
boiler, even from a hygienic point of view.
b) Check that boiler is set up to operate with the
available type of fuel.
The type of fuel can be seen written on the
package and on the technical feature plate.
c) Check that the chimney/flue has an appropri-
ate draught, without any bottlenecks, and that
no exhausts from other appliances are insert-
ed, unless the flue has been implemented to
accommodate several utilities according to
specific standards and prescriptions in force.
Only after this check can the fitting between
the boiler and chimney/flue be mounted.