53
Servicing schedule
-
Remove the screws “B” (with a 13 mm socket or open
wrengh) and remove the fixing plates
•
Screws on thermal elements
-
Remove the screws “A”, fixing the burner covers,
with a 13 mm socket wrengh,
-
Remove the screws gas collector (left and right side).
-
Remove the four screws with a 10 mm socket wrengh,
then the gas flange
Summary of Contents for MODULEX EXT 100
Page 1: ...E N G L I S H 100 150 200 250 300 350 INSTALLATION AND SERVICING INSTRUCTIONS MODULEX EXT ...
Page 32: ...32 Instructions for the installer THERMOSTAT FBR 2 CONNECTION room sensor ...
Page 33: ...33 Instructions for the installer MODULATING THERMOSTAT CONNECTIONS ...
Page 35: ...35 Instructions for the installer ...
Page 37: ...37 Instructions for the installer Sensor terminal assignments Terminal assignments BCM ...