19
2.6. TRANSPORT AND HAULING OF THE MACHINE
•
All of our machines are extensively tested in the factory and delivered as
perfectly assembled situation. If there is any damage happened to machine,
the transportation company must be informed at once.
•
Besides that, all of the standard and optional accessories specified on the
documents must be checked whether they are existing or not.
•
Transport and placement of the machine must be handled with the proper
transport means.
•
Pay attention to the warning remarks on the package for transport and storing
of the machine.
•
Maximum quantity of the machine to be stowed as one above the other is 3.
2.7. Main Parts
Summary of Contents for G-250
Page 2: ......
Page 35: ...33 1 4 1 5 2...
Page 36: ...34 2 1 2 2 10 2 3 2 4...
Page 38: ...36 3 2 7 NO NO NO...
Page 40: ...38 3 2 800 750x500 M10x100 3 3 3 4 3 5...
Page 41: ...39 3 6 4 4 1 15 22 5 30 45 90 4 2 46 90 M8 25 mbus 51 33 34 32 34 34 33 M8 25 mbus 51 5...
Page 42: ...40 5 1 I 3 4 O 5 2 45 90 O 90 12 41 12 6...
Page 43: ...41 I O 7 8 1 12 T 5 2 M12 15 59...
Page 44: ...42 12 2 3 4 5 6 7 8 9 9 1...
Page 45: ...43 9 2 220 1 2 Kw 230 50 Hz 2850 300 0 15 22 5 30 45 0 45 50 80 92 110 20 24 22 26 6...
Page 50: ...G 250 G 300 AT CE...
Page 52: ...7 9 8 9 9 21 3 32 4 32 AT EC 22 23 2 4 Uluda makina 2 5 2 6 4...
Page 53: ...4 3 2 3 3 21 3 4 3 5 PVC 5...
Page 56: ...4 4 2 4 3 22 972 722 M10x100 4 4 4 5 4 6 8...
Page 58: ...6 3 2 O 67 2 M12 63 M12 7 I O 8...
Page 59: ...9 2 M12 M12 15 7 M12 T 7 4 3 4 5 6 7 8 9...
Page 64: ...48...