7
MOBUS
DUAL FUEL INSTALLATION CENTRAL
HEATING AND ATLANTIS
a
b
Fig. 9
Fig. 10
11(+0/+1) cm
1.
Reverse the empty towel rail carefully leaning it on a soft cloth/ surface.
2.
Take the MOBUS from the package, handling with care.
3.
Remove the spacer without damaging it (Fig. 9a). Do not use tools or lubricants. Use
gloves. Ensure that the pipe and the resistor are not bent and stay parallel to each
other.
4.
Insert the T-piece in the MOBUS (Fig. 9b), screw and tighten it
firmly (Fig. 9c). Do not use tools.
5.
Insert the spacer to the distance shown in the Figure (Fig. 9d). If the spacer is
damaged, replace it. Do not use tools or lubricants. Ensure that the pipe and the
resistor are not bent and stay parallel to each other.
6.
Insert the tip of the MOBUS heating element into the bottom hole of the towel rail as
shown and make sure to select the female ½” GAS thread of the towel rail in the
opposite vertical tube to where the 3 Bar valve is installed.
7.
Then using a 27 mm spanner turn the T-piece with screwed MOBUS heating element
until the last nipple thread turn and if necessary continue in order to have the
regulating box facing forward (Fig. 10).
8.
Make sure that the MOBUS gasket is fully sealed to the female
thread of the towel rail.
9.
Install properly the electrified towel rail with the M O B U S into the wall
and connect it to the central heating system according to towel rail
manufacturer instructions. Make sure that the towel rail is properly filled and
the MOBUS is on the bottom side.
10.
Verify that no water leakages occur and re-tighten joints as necessary. Make
sure that MOBUS parts are completely dry before proceeding with the
installation (in case of water leakage refer to DANGEROUS CONDITION
AND RISK section).
11.
Connect the MOBUS cable to the mains power according to current wiring regulation
in force in the country where the product is installed.
3 bar valve
Fig. 11