MOBUS
6
The gasket (A) must be completely
screwed into towel rail thread
A
Fig. 4
INSTALLATION STEPS
ELECTRIC ONLY ATLANTIS INSTALLATION
Fig. 5
Fig. 6
1.
Reverse the empty towel rail carefully leaning it on a soft cloth/
surface and fill it properly.
2.
Take the MOBUS from the package, handling with care.
3.
Insert the tip of MOBUS heating element into the bottom hole of the towel rail as
shown and make sure to select the female ½” GAS thread of the towel rail in
the opposite vertical tube to where the 3 Bar valve is installed (Fig. 5).
4. I
nsert the MOBUS heating element all the way.
5.
Then using a 27 mm spanner screw the MOBUS heating element until the last nipple
thread turn and if necessary continue in order to have the regulating box
facing forward (Fig. 6).
6.
Make sure that the MOBUS gasket is fully sealed to the female
thread of the towel rail (Fig. 4).
7.
Install properly the electrified towel rail with the MOBUS into the wall
according to towel rail manufacturer instructions. Make sure that the towel
rail has the MOBUS bottom side.
8.
Verify that no water leakages occur and re-tighten joints as necessary.
Make sure that MOBUS parts are completely dry before proceeding
with the installation (in case of water leakage refer to DANGEROUS
CONDITION AND RISK section).
9.
Make sure that the power lines are appropriate for the load required.
10.
Connect the MOBUS cable to the mains power according to current wiring
regulations in force in the country where the product is installed.
bar valve
Fig. 7
Fig. 8
Radiator
3 bar valve