background image

Page 1.0) 

 

WPC600 Tow

el Rail Heater Wall Plate C

ontroller 

 

for V

ariable Pow

er Control of  Standard Tow

el Rail Heaters 

 

Feat
ur

es

 

 

Fi

ts st
andar

d U
.K

. 13A
 si

ngl
e out

let

 back box

 

 

Pow
er

 adj
ust
abl
e i

n 5 st

eps f

rom
 20%

 to 100 %

 

 

Standby 

/ Pow

er 

B

utto

n  

(B

lu

e/A

m

ber
)  

 

EC

O

  but

ton (
G

reen)
  P

ow
er

 O

n f

or

 2 hr

 

T

his

 fittin

g k

it c

on

ta

in

 

1 x W

PC

 600 w

all pl

ate

 c

ont

rol

ler

 

1 x pl

ast

ic ba

g c

ont

aini

ng 

 

2  of
f m

3.

5 x 35m

m

 e

lec

tric

al s

cre

w

s f

or

 se

cur

ing t
he

 W

PC

 to t

he

 S

pur
 O

ut

let  

 

1 o

ff  s

trai

n r

el

ief

 cl

am

p b

ar

 

2 of
f 2.

8 m

m

 x 

9m

m

 se

lf t

appi

ng 

scr

ew

s f

or

 se

cur

ing 

the

 fle

xi

bl

e c

abl

e s

tra

in 

rel

ief

 cla

m

of

f s

et on f
itti

ng &

 ope
rat

ing i
nt

ruc

tions
 

 

 

 

Page 2.0) 

  W

ir

in

g &

 In

sta

lla

tio

 

Thi

s c

ont

rol

le

r i

s de

si

gne

d f

or

 us

e on M

ai

ns

 vol

ta

ge

 of

 230 

a.

c.

 &

 m

ay

 b

e u

sed

 w

ith

 

St

anda

rd 

To

w

el

 rai

l h

eat

er

s (n

o i

nt

ern

al

 c

on

tro

lle

r) 

up t

o 600 w

at

ts

  W

e r

eco

m

m

en

w

irin

g to

 th

Spur

 out

le

t be

 1.

5m

m

 sq

, f

la

t tw

in

 &

 E

ar

th

 a

s th

is

 w

ill m

ak

it e

as

ie

r t

fit 

th

m

ai

ns

 w

irin

g to

 th

te

rm

in

al

 b

lo

ck

 of

 the

 W

PC

. T

he cu

rr

en

t cap

aci

ty

 o

th

is

 c

ab

le

 (1

8A

) i

s w

el

l w

ithi

n t

he

 m

axi

m

um

 nom

ina

l ope

ra

ting c

ur

re

nt

 a

t 6

00

 w

atts

 o

2.

6A

 T

he

 S

uppl

y s

houl

d be

 fed

 v

ia a 

(rc

bo

) &

 ha

ve

 it

s ow

n  

re

m

ot

Is

ol

at

ing s

w

itc

h  

 

  In

st

al

l t

he

 Sp

ur

 fe

ed

 &

 F

lex

ib

le H

eat

er

 C

ab

le 

as sh

ow

 

 

 

 

Page 3.0) 

 

O

pe

ra

tio

&

  P

ro

gra

m

m

Se

t U

  C

ont

inuo

us

 O

pe

ra

tio

  A

fte

r w

irin

g,  

sc

re

w

  t

he

 W

all P

la

te

 c

on

tro

lle

r to

 it

s ba

ck box

, u

si

ng

 th

e 3

.5

m

m

 e

le

ct

ric

al

 

sc

re

w

s p

ro

vi

de

d;

  S

w

itc

h on pow

er

 fe

ed t

o t

he

 uni

t. 

  Po

w

er 

LED

 w

ill g

lo

w

 

BLU

E

 to s

how

 the

 uni

t i

s i

n S

ta

ndby.

 

  Pr

ess S

ta

ndby /

 P

ow

er

 B

ut

ton

  onc

e;

 P

ow

er

 L

ED

 c

ha

nge

s t

R

ED

  &

 Po

w

er

 se

tti

ng

 LED

1 &

 2

 w

ill lig

ht to

 indi

ca

te

 the

 de

fa

ul

t P

ow

er

 se

tti

ng of

 40%

  

  W

e r

ec

om

m

end t

ha

t t

he

 tow

el

 ra

il be

 run f

or

 45 m

ins

 to s

ee

 w

ha

t t

em

pe

ra

tur

e t

hi

s pow

er

 

se

tti

ng

 p

ro

du

ce

s I

f n

ot

 w

ar

m

 e

no

ug

h, i

ncr

eas

e p

ow

er

 us

ing t

he

 “

+”

 but

ton t

o i

nc

re

as

or 

  

“-

“ t

o r

ed

uce 

ra

il 

te

m

pe

ra

tu

re

. A

ga

in a

llow

 30

-4

5 m

in

s f

or

 th

es

e ch

an

ges

 to

 tak

e ef

fect

  Thi

s pow

er

 se

tti

ng w

ill

 be

 st

or

ed i

n t

he

 c

ont

rol

le

r m

em

or

y.

 In t

he

 e

ve

nt

 of

 a

 pow

er

 fa

ilur

th

is

 se

tti

ng

 w

ill

 b

e l

os

t &

 it

 w

ill

 b

e n

ec

es

sa

ry

 to

 re

-pr

ogr

am

m

e t

he

 uni

t. 

 

T

im

er

 (E

co

) fu

nc

tio

 

W

he

n t

he

 

E

co

 ke

y i

s pr

es

se

d t

he

 P

ow

er

 L

ED

 tur

ns

 

G

RE

E

N.

 

 T

he 

heat

er

 is

 p

ow

er

ed

 fo

r a 

pe

riod of

 120 m

ins

 &

 the

n s

w

itc

he

s of

f  

 

  Tw

di

ff

er

en

t p

ow

er

 lev

el

s m

ay

 b

e s

et

 to a

ppl

y t

o t

he

 120 m

inut

es

 ope

ra

ting t

im

 

  The

 F

irs

t P

ow

er 

le

ve

l m

ay 

be

 se

t w

ithi

n t

he

 30 m

ins

 o

f in

itia

tio

&

 th

e S

eco

nd

 af

ter

 th

30 m

ins

 ha

s e

la

ps

ed

. T

his

 se

co

nd

 p

ow

er

 le

ve

l w

ill

 a

ppl

y f

or

 the

 re

m

ai

ni

ng 

90 m

ins

 run 

tim

e. 

  Th

is

 feat

ur

e p

er

m

its 

“boos

t” 

to

 b

e s

et

 to

 g

et

 th

e ra

il 

up t

o t

em

pe

ra

tur

e f

or

 the

 fi

rs

t 30 

m

in

s t

he

to

 a

pp

ly

 a

 h

ol

di

ng

 te

m

pe

ra

tu

re

 fo

r t

he

 re

m

ai

ni

ng

 9

m

in

s. 

   

  Th

ese v

al

ues 

w

ill

 the

n be

 re

m

em

be

re

d f

or

 e

ac

h 120 m

ins

 pe

riod of

 ope

ra

tion a

nd 

m

ay 

be

 

re

pr

ogr

am

m

ed f

ol

low

ing t

he

 30 m

in t

em

p t

he

n 90 m

in t

im

e pe

riods

.  

 

 

A

gai

n t

hese set

tin

gs w

ill

 b

e l

ost

 if

 th

e p

ow

er

 fai

ls

   

        

 

  

 

 

Page 4.0) 

 

Sp

ec

ific

atio

 

M

ain

s V

olta

ge

   

 

230v a

.c. 

 

O

ut

put

 

   

V

olt

 free r
el

ay

 co

ntact

 (N

O

 

M

axi

m

um

 C

ur

rent

  

2.

6 A
m

ps

 (600 w

att H

ea

ter

 

R

el

ay

 C

ycl

e T

im

  

5 m
ins

  

 

Pow

er A

dj

us

tm

ent

    

1 x L

ED

  = 

20%
 P

ow

er 

    

2 x L

ED

s  

 

40%
 pow

er 

    

3 x L

ED

 

60%
 P

ow

er 

    

4 x L

ED

s = 

80%
 pow

er 

    

5 x L

ED

s = 

100 %

 pow

er  

 

Ex

pect

ed

 rel

ay

 co

ntact

 lif

e  

9.

5 ye
ars

 

 

C

E C

ertif

ic

atio

  3

rd

 P

arty

 c

ertif

ic

at

ed

 fo

r N

ois

Im

m

un

ity

    

Elect

rical

 S

af

et

y  

 

   

IP

 ra

tin

g    

IP

55 f
ront

 pa

ne

l  

                                                          

To

 ach
iev

e g

reat

er

 th

an

 IP

x4

 S

ilico

ne S

eal

ing

 is 

requi

red be
tw

ee

n t

he

 ba

ck

 of

 the

 W

PC

 &

 the

 m

ount
ing f
ac

e. 

 

    

    

    

    

    

    

    

    

    

    

    

    

    

    

    

    

    

    

    

    

 

 

 

U

ltraheat

 – 

heat
ing di

vis

ion of

  

the 
Pit

acs 
G

roup

 

B

radbour

ne 
P

oi

nt

, B

radbour

ne D

rive

 

Tilbr

ook
, M

ilton K
eynes

, B

uc

kingham

shi

re M
K

8A

U

ni

ted K
ingdom

 

Tel

: + 44 (

0)

1865 400514

 

Fax:
 +

 44 (

0)

1865 400419

 

inf

o@
pi

tac

s.c

om

 

w

w

w

.p

ita

cs

.c

om

 

Jobname: 22052 Pitacs WPC v1 Sig: 1 Side-Front

  

Jul-19-11

  

--

--

--

--

PREPS

C

M

Y

K

PREPS

C

M

Y

K

PREPS

C

M

Y

K

PREPS

C

M

Y

K

CyanMagentaYellowBlack

Cyan

Magenta

Yellow

Black

Summary of Contents for MOBUS

Page 1: ...sing the button to increase or to reduce rail temperature Again allow 30 45 mins for these changes to take effect This power setting will be stored in the controller memory In the event of a power failure this setting will be lost it will be necessary to re programme the unit Timer Eco function When the Eco key is pressed the Power LED turns GREEN The heater is powered for a period of 120 mins the...

Page 2: ...RPROFESSIONAL INSTALLER ONLY The image isfor illustration purposes only SUPPLIED PARTS IN EACH PACKAGING MOBUS I 2 spacer I Instruction leaflet APPLICABLE EUROPEAN STANDARD Electrical tests according to CEI EN 60335 1 Applicable directives 2011 65 EU RoHS Directive 2006 95 EC Low Voltage Directive 2004 108 EC EMC Directive COD 571357670 REV 06 2015 ...

Page 3: ...refully selected in proportion to function of the towel rail size and thermal output ToselectMOBUS electrical power please refer to the towel rail manufacturer instructions when a certification related to the complete system according to EN 60335 2 43 issued by an European recognized institute like SEMKO VDE IMQ is available In caseof missing towel rail manufacturer certification refer to EN 60335...

Page 4: ...he top part of the rail in the opposite side where the MOBUS is installed In case of valve intervention it is quite normal for liquid relief and water excess to possibly reach the floor Please take this aspect into consideration In Dual fuel installation with central heating and MOBUS at least one of the rail valves must always be left open when the electrical element is switched on For all other ...

Page 5: ...on IPX4 Operating Ambient Temperature 0 C 40 C Storage Temperature 20 C 80 C Max Humidity Level 85 at 25 C without condenses Water Temperature Regulation ON OFF 5 C 70 C 5 C with bimetallic capillary thermostat Nipple thread Gas cylindrical INSTALLATION BEFORE YOU START Check the pack to ensure you have all of the parts listed on pag 1 with no visible signs of damage If any of the part is missing ...

Page 6: ...THIS PRODUCT MUST BE EARTHED Don t use the MOBUS regulating box to lean the electrical towel rail on the floor as you can damage the plastic and water can penetrate inside with a risk of electrical shock The electrical heating element must be permanently connected to a suitable electricity supply by way of the cable provided This should be via a fused spur in accordance with the IEE Wiring Regulat...

Page 7: ...f necessary continue in order to have the regulating box facing forward Fig 6 6 Make sure that the MOBUS gasket is fully sealed to the female threadofthetowelrail Fig 4 7 Install properly the electrified towel rail with the MOBUS into the wall according totowel rail manufacturer instructions Makesure thatthetowel railhastheMOBUSbottomside 8 Verify that no water leakages occur and re tighten joints...

Page 8: ... threadofthetowelrailinthe oppositeverticaltubetowherethe3Bar valve isinstalled 7 Thenusinga27mmspannerturntheT piecewithscrewedMOBUS heatingelement untilthelastnipplethreadturnandifnecessary continue in order to have the regulatingbox facingforward Fig 10 8 Make sure that the MOBUS gasket is fully sealed to the female thread of thetowelrail 9 Install properly the electrified towel rail with the M...

Page 9: ... rail from the wall and reverseit carefully leaningit on asoft cloth surface 3 Using a 27 mm spanner unscrew the MOBUS rotating it anticlockwise until the MOBUS thread is completely off from towel rail GAS female thread Fig 14 4 Remove the MOBUS from the towel rail DUAL FUELINSTALLATION CENTRAL HEATINGANDMOBUS 1 Disconnect thecable from themains power 2 Closebothrailvalves removethewaterfromthetow...

Page 10: ...tion never switch the MOBUS ON to verify heating effectiveness DANGEROUSCONDITIONANDRISKS Duringinstallation de installationandmaintenance ensure workingplacesafetyuntiltheoperationiscompleted Don t use excessive force to turn the knob as you risk to break it In case of anomalous or strange working condition or if MOBUS has visible signs of damage disconnect the MOBUSand send it to the seller for ...

Page 11: ...y as it has no spare parts IMPORTANT In case of doubts please contact the Seller or refer to Contacts section IMPORTANT Please retain these instructions for future reference NOTESFORDISPOSALOFTHISPRODUCTVALIDFORTHEEUROPEANUNION The crossed out wheeled bin symbol on your product reminds you that in the European Union all electrical and electronic products and batteries must be taken to separate col...

Page 12: ...eutral and Ground wires Class 1 or connecting the Live Neutral and Fil Pilote control connection auxiliary wires Class 2 Live Neutral Ground Fil Pilote Class I Brown Blue Yellow Green Class 2 Brown Grey Black INSTALLATION CLASS I Cable and Wall 1 Insert resistance in the upside down radiator 2 Screw in the resistance using 25 mm wrench not included 3 Insert the cable into the grommet Connect the w...

Page 13: ...vom Heizkörper mit Kabel eventuell in der Wohnung installiert Setpoint Temperatur die erreicht u o beibehalten werden soll DISPLAY und BEDIENELEMENTE Display Taste Mode Taste Standby LED Das Gerät Stone kann mit den beiden Tasten bedient werden die sich am Gerät befinden oder mit der App die aus dem Store heruntergeladen werden kann STROMVERSORGUNG Für den Gebrauch kann das Gerät Stone mit dem Mitt...

Reviews: