Ultimate Jets
- Diamond assembly manual - Revision 4 - 01/01/2015
31
Gear valves, air tanks, batteries, receiver
Gear and brake valves can be fitted in the cockpit area. The air tanks can be fitted in the nose area, around
the front gear bay. With the e-tract option, the setup is much cleaner and the e-tract controller can be
screwed vertically onto the front cockpit former.
The receiver will be placed behind the cockpit bulkhead, in the floor square reservation.
The receiver loom should pass from the tail to the front below the left hand inlet duct.
The wings loom will pass below the cockpit floor, straight from the USC female panel plugs.
A power distribution system is required. We recommend the use of our Weatronic Gizmo 22 HV receiver
for this plane. It's 8 current regulators/ power bus and servo line monitoring/ isolation logic is a must for
this very fast model. The Weatronic switch fits into the front cockpit bulkhead hole, just above the e-tract
gear controller. Very little wood work is needed to fit the module.