Prior to recharging the system, it shall be pressure tested with OFN. The system shall be leak tested on
completion of charging but prior to commissioning. A follow up leak test shall be carried out prior to
leaving the site.
Decommissioning
Before carrying out this procedure, it is essential that the technician is completely familiar with the equip-
ment and all its detail. It is recommended good practice that all refrigerants are recovered safely.
Prior to the task being carried out, an oil and refrigerant sample shall be taken in case analysis is required
prior to re-use of reclaimed refrigerant. It is essential that electrical power is available before the task is
commenced.
a) Become familiar with the equipment and its operation.
b) Isolate system electrically.
c) Before attempting the procedure ensure that:
• mechanical handling equipment is available, if required, for handling refrigerant cylinders;
• all personal protective equipment is available and being used correctly;
• the recovery process is supervised at all times by a competent person;
• recovery equipment and cylinders conform to the appropriate standards.
d) Pump down refrigerant system, if possible.
e) If a vacuum is not possible, make a manifold so that refrigerant can be removed from various parts
of the system.
f) Make sure that cylinder is situated on the scales before recovery takes place.
g) Start the recovery machine and operate in accordance with manufacturer´s instructions.
h) Do not overfill cylinders. (No more than 80 % volume liquid charge).
i) Do not exceed the maximum working pressure of the cylinder, even temporarily.
j) When the cylinders have been filled correctly and the process completed, make sure that the cylinders
and the equipment are removed from site promptly and all isolation valves on the equipment are closed
off.
k) Recovered refrigerant shall not be charged into another refrigeration system unless it has been
cleaned and checked.
Labelling
Equipment shall be labelled stating that it has been de-commissioned and emptied of refrigerant. The
label shall be dated and signed. Ensure that there are labels on the equipment stating the equipment
contains flammable refrigerant.
Recovery
When removing refrigerant from a system, either for servicing or decommissioning, it is recommended
good practice that all refrigerants are removed safely.
Summary of Contents for DH5010
Page 3: ...FIG 2 FIG 1 FIG 3...
Page 57: ...57 UFESA 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24...
Page 58: ...58 8 30 cm T 250V 3 15...
Page 59: ...59 4 m2 R290 40g...
Page 60: ...60...
Page 61: ...61 0 C B B TRENDS SL 20 cm 50 cm 1 24...
Page 62: ...62 1 24 1 80 30 5 9 1 24 1 5 5 5 5...
Page 63: ...63 5 5 50 16 C 1 8 38 2 12 C 5 60 12 16 C 10 2 9 mm 3 0 6 m...
Page 64: ...64 2...
Page 65: ...65 5 32 C 2012 19...
Page 66: ...66 C02...
Page 67: ...67...
Page 68: ...68...
Page 69: ...69 25...
Page 70: ...70...
Page 71: ...71 a b c d e f g h 80 i j k...
Page 72: ...72...
Page 73: ...73...
Page 74: ...74 8 30 51 3 250 T 2 4 R290 40...
Page 75: ...75 UFESA 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 On Off 23 On Off 24...
Page 76: ...76 B B TRENDS SL 1 50 20 24 24 5 30 80 TIMER TIMER 24 5 TIMER TIMER 5 5 5...
Page 77: ...77 0...
Page 78: ...78 32 5...
Page 79: ...79 50 5 5 16 P1 12 2 38 8 16 12 60 5 10 2 9 3 6 0...
Page 80: ...80...
Page 81: ...81 WEEE EU 91 2102 C02...
Page 82: ...82 octafluoronaphthalene OFN 08...
Page 83: ...83 52 octafluoronaphthalene OFN octafluoronaphthalene OFN octafluoronaphthalene OFN...
Page 84: ...84...
Page 85: ...85...
Page 88: ...88 B B TRENDS SL e B B TRENDS SL 1999 44 B B TRENDS SL B B TRENDS SL...
Page 89: ...89 B B TRENDS SL 23 2003 B B TRENDS SL 2003 10 B B TRENDS SL...