7
1. Set the rework station correctly. Install the hot air gun holder to the
left side of the station, and place the hot air gun onto the holder.
2. Install the required nozzle (Use of large-diameter nozzles is
recommended), and connect the station's power cord to an electrical
outlet.
3. Turn ON the power switch, and the temperature display shows "--- "to
indicate the hot air gun in standby mode. Set the desired temperature by
using the increase and decrease buttons, and then pick up the hot air gun.
The hot air gun will enter its standard operation status, and the hot air
gun's operation indicator light (the dot located at the bottom-right corner
of the temperature display) turns ON. The indicator stays ON when
station heating up, blinks rapidly when the temperature is stabilized and
turns OFF when station cooling. Adjust the air volume adjustment knob
to set the appropriate air volume, and begin operation once the
temperature has stabilized. The operation indicator blinks rapidly when
the temperature enters stabilization. At this point, the precision PID
II.OPERATION
Hot Air Rework Station