16
1. Keep the air outlet clear and free of blockages at all times.
2. The installation of the hot air nozzles MUST be carried out ONLY
when the steel pipe and nozzles have cooled. Install the nozzle correctly.
DO NOT install the nozzle with brute force, pull the edge of the nozzle
with tweezers, or over-tighten the screws.
3. Select the appropriate nozzle based on your operation requirement
(temperatures may vary when using nozzles in different diameters). When
using nozzles smaller than the stock nozzles, you MUST use the
maximum fan speed with a relatively lower temperature setting.
Complete this operation in the shortest possible duration to prevent
damaging the hot air gun.
4. Keep a minimum distance of 2mm between the object and the hot air
gun’s air outlet.
5. DO NOT allow the hot air to come in direct contact with facial parts,
and beware of the danger of burn injuries. Upon the first use, the hot air
gun may emit white fumes, and the white fume will dissipate in a short
III. MAINTENANCE & PRECAUTIONS
Hot Air Rework Station