THE BOILER IS TOP-HEAVY. Do not
allow it to tip over.
1.
Remove the sleeve.
2.
Remove the contents from the skid, except
the boiler.
3.
Remove the four (4) hex-drive lag screws
holding the boiler to the skid (Figure 1-a).
1. UNPACk THE CRATE
4.
Tip the boiler and shimmy it off the skid.
2. POSITION THE BOILER
WARNINGS
OBSERVE MINIMUM CLEARANCES
to
combustible walls and ceilings to avoid potential
fire hazard.
DO NOT INSTALL ON CARPET
. This may cause
a fire.
INSTALLING THE BOILER NEAR A SOURCE OF
FLAMMABLE LIQUIDS
or gases may cause fire or
explosion.
CLEAN BURNERS DAILY if operating the boiler in
a dusty environment.
PROTECT IGNITION SYSTEM COMPONENTS
from sources of water that may spray, drip, or rain
on them during installation, operation and service.
1-a
1-b
1.
Slide the boiler into desired location.
2.
Meet the minimum clearances to
combustible construction per the
Specification
Section of this manual.
3.
Allow 24" service clearance in front and on
the left side of the boiler.
4.
Level the boiler, using shims as necessary.
Summary of Contents for ESC
Page 7: ...7 Figure S 1 Minimum Clearances to Combustibles SPECIFICATIONS continued...
Page 20: ...20 Figure 10 d Operating Instructions 10 Perform Startup Checks and Adjustments continued...
Page 37: ...37 Internal Wiring Figure IW 1 Wiring Diagram...
Page 38: ...38 Internal Wiring continued Figure IW 2 Wiring Diagram...