4
103448-10- 6/18
I.
Product Description, Specifications and Dimensional Data......................
5
II.
Unpacking Boiler........................................................................................
9
III.
Pre-Installation and Boiler Mounting ........................................................
10
IV.
Venting......................................................................................................
17
A. General Guidelines............................................................................... 18
B. CPVC/PVC Venting.............................................................................. 22
C. Polypropylene Venting.........................................................................
35
D. Stainless Steel Venting........................................................................ 43
E. Removing the Existing Boiler............................................................... 48
F. Multiple Boiler Installation Venting.......................................................
50
V.
Condensate Disposal................................................................................. 52
VI. Water Piping and Trim............................................................................... 54
VII. Gas Piping ...............................................................................................
70
VIII. Electrical ................................................................................................... 74
IX. System Start-up .......................................................................................
88
X.
Operation...................................................................................................... 96
A. Overview............................................................................................... 96
B. Supply Water Temperature Regulation................................................
97
C. Boiler Protection Features.................................................................... 98
D. Multiple Boiler Control Sequencer........................................................ 99
E. Boiler Sequence of Operation.............................................................. 100
1. Normal Operation........................................................................... 100
2. Using The Display.......................................................................... 101
3. Status Screens.............................................................................. 102
4. Detail Screens............................................................................... 104
5. Multiple Boiler Sequencer Screens................................................ 105
F. Changing Adjustable Parameters........................................................
106
1. Entering Adjust Mode.................................................................... 106
2. Adjusting Parameters..................................................................... 107
XI. Service and Maintenance ........................................................................ 124
XII. Troubleshooting........................................................................................ 131
XIII. Repair Parts ............................................................................................. 136
Table of Contents
Summary of Contents for Alpine ALP080B
Page 76: ...76 103448 10 6 18 VIII Electrical continued...
Page 77: ...103448 10 6 18 77 VIII Electrical continued Figure 27 Wiring Connection Diagram...
Page 78: ...78 103448 10 6 18 Figure 28 Ladder Diagram VIII Electrical continued...
Page 146: ...146 103448 10 6 18...
Page 147: ...103448 10 6 18 147...