7. Position OBT; shrink in place.
Place a CLEAR Oil Barrier Tube (OBT) over each phase, butted
to the lead sheath (or belt paper) cutback. Shrink the three OBTs
in place starting at the lead sheath cutback.
Note:
To achieve a smooth, wrinkle-free installation, use a
reduced flame to install the thin-walled OBT.
OBTs
Lead
Sheath
PILC
394
8. Inspect OBTs.
The installed OBTs should have a smooth, wrinkle-free surface
after shrinking. Reheat to smooth any wrinkled areas.
PILC
395
9. Mark OBT/ Insulation at G.
Kit G
HVS-T-1581E-S 5-1/2”
(140m
m)
HVS-T-1582E-S 6-1/2”
(165mm)
HVS-T-1583E-S 7”
(178mm)
PILC
OBT/Insulation
G
C
L
220
PCN 307937-000
Effective Date: March 13, 2007
PII 54917, Rev AJ
5
10. Position black conductive tubes; shrink in place.
Place black conductive tube over each phase and position at
dimension G.
Shrink in place starting at the end nearest to the center of the
splice.
PILC
Black
Conductive Tubes
I
221
11. Clean OBTs.
Using an oil-free solvent, clean the OBT/Insulation, as shown.
OBT/Insulation
Clean
PILC
222
12. Install SRM insert.
Assemble SRM insert per box instructions. Spread the phases
and position the insert as shown.
Note:
The SRM insert is packaged inside the conductive
breakout.
SRM Insert
SRM Insert
PILC
223