http://www.TYAN.com
35
3.
Press the load lever with your thumb (A), and then move it to the right (B) until
it is released from the retention tab.
4.
Lift the load lever in the direction of the arrow until the load plate is completely
lifted.
5.
Position the CPU over the socket, ensuring that the gold triangle is on the
bottom-left corner of the socket, and then fit the socket alignment keys into the
CPU notches.
Summary of Contents for S7040
Page 24: ...http www TYAN com 24 J15 J17 J23 J18 J19 J29...
Page 26: ...http www TYAN com 26 J33 ID_LED1 IPMB1 J26 J25 J31...
Page 28: ...http www TYAN com 28 J30 J80 J32 KEY_1 SGPIO2 SGPIO4 SGPIO3...
Page 30: ...http www TYAN com 30 J79 J196 CLEAR_BTN1 2PHD_1 2PHD_2...
Page 33: ...http www TYAN com 33 2 You have completed the Patsburg Upgrade ROM Key installation...
Page 62: ...http www TYAN com 62 3 6 6 1 Socket 0 CPU Information Read only...
Page 67: ...http www TYAN com 67 3 6 8 SATA Configuration...
Page 69: ...http www TYAN com 69 3 6 9 SAS Configuration Read only...
Page 74: ...http www TYAN com 74...
Page 75: ...http www TYAN com 75 3 6 13 Super I O Configuration Super IO Chip Read only...
Page 83: ...http www TYAN com 83 3 7 1 North Bridge Chipset Configuration...
Page 91: ...http www TYAN com 91 3 7 1 3 DIMM Information Read only...
Page 115: ...http www TYAN com 115...
Page 116: ...http www TYAN com 116 NOTE...