background image

 

11 

 

the  two  structures  and  the  20m  for  the  connection  of  the  structures  with  the 
cabinet  passing  through  the  grounding,  so  that  all  the  grounding  points  are 
connected to each other. Make sure that the grounding of all cabinet structures 
are connected to each other via the ground wire. 

 

4.5. Recommendations for batteries installation  

1. Make sure the inverter is turned off and has no grid connection. 

2. Make sure the battery is also turned off. 

3. Set up battery switches as follows: 

 

 

4. Place the battery in the capsule structure with the corresponding screws. 

5.  If  you  incorporate  a  pair  of  batteries,  connect  them  in  parallel  and  to  the 
inverter. If you only have one battery, connect it directly to the inverter (picture 
detail). 

6. Connect the RJ cable to the CAN port of the master battery. Also connect the 
Master Battery to the slaves with the corresponding RJ connector (picture detail). 

Master battery:  

     

 

   Rest of batteries:

 

Summary of Contents for SunBox H

Page 1: ...Instruction manual SunBox Model H...

Page 2: ...nd its complementary technical instructions specifically the ITC_BT 03 04 05 and 40 and the rest of the current regulations either locally or regionally Non compliant use use of the product in applica...

Page 3: ...ons for setting up strings 6 4 2 Preliminary recommendations for installation 6 4 3 DC wiring 10 4 4 AC wiring 10 4 5 Grounding 10 4 5 Recommendations for batteries installation 11 4 5 Commissioning 1...

Page 4: ...o Hybrid Inverter Series Model 5000 48 o Batteries Lithium Series 5 1kWh 2 Description and operation Description The SunBox consists of a mounted and wired cabinet prepared to include up to 2 Turbo En...

Page 5: ...way energy is accumulated for later use at times when energy production is not sufficient 2 When the demand for electricity consumption exceeds the energy produced by photovoltaic panels the Inverter...

Page 6: ...n the end the Inverter performs the energy balancing functions and ensures the operation of the system 2 Back Up mode It is a mode that ensures that when the grid fails the critical loads connected co...

Page 7: ...Wh DoD 90 Cycles at 90 DoD 6000 Manufacturer Cells CATL Cells Metal Can Type of technology LiFePO4 Nominal battery voltage 51 2V Max current Loading Unloading 50A Communication with BMS CAN Batteries...

Page 8: ...ept dry and avoid potentially flooded areas The operating temperature range should be considered which must not exceed 50 C or be less than 0 C Take appropriate measures to ensure the operating temper...

Page 9: ...mm2 hose In case batteries need to be installed the SunBox model H comes ready to store up to 2 Turbo Energy Lithium Series 5 1kWh batteries Its installation is explained below The Network and Back u...

Page 10: ...parate the general loads top of the image and the back up loads bottom Therefore for easier connection and to avoid handling of the connections of the installation loads the following configuration is...

Page 11: ...from causing momentary power outages it is proposed to place an automatic switch that allows network power without going through the SunBox The SunBox Model H is not prepared to withstand excessively...

Page 12: ...l the installation is complete 4 4 AC wiring To connect Grid Back up and Ez meter open the back door of the Model H cabinet and connect to the pointed and identified terminals with colors phase gray n...

Page 13: ...is turned off and has no grid connection 2 Make sure the battery is also turned off 3 Set up battery switches as follows 4 Place the battery in the capsule structure with the corresponding screws 5 I...

Page 14: ...with all connections the machine is ready to commission It will proceed as follows 1 Reset the DC and AC protections at the back of the cabinet 2 Start the Batteries To do this press the Power button...

Page 15: ...iled information refer to the HIS 5000 48 Inverter Manual 6 Security measures To ensure proper installation it is recommended i Use safe mounting tools and install safety devices Use healthy stairs an...

Page 16: ...rent in the presence of solar radiation and verified that the rest of the lines do have contact technical service 8 Troubleshooting Carefully review the content of Page 10 of the Battery Manual Page 2...

Page 17: ...TECHNICAL DATA SHEETS APPENDIX INVERTER CHARGER BATTERIES...

Page 18: ...https www turbo e com Technical data Hybrid Inverter Series 3600 48 and 5000 48 https www turbo e com HYBRID INVERTER WITH BACK UP MODE MAXIMUM CUSTOMER SATISFACTION 5 years...

Page 19: ...artup voltage 150V Max input current A 11A 11A N MPPTs 2 Strings per MPPT 1 1 Output data CA Nominal Power W 3600W 5000W Max Power W 3960W 5500W Peak Power Offgrid Twice the Nominal Power 10S Max Back...

Page 20: ...https www turbo e com Technical data Battery Lithium Series 48V 5 1 kWh LONG LASTING LITHIUM ION BATTERIES MAXUMUM CUSTOMER SATISFACTION PLUG PLAY years 10 years https www turbo e com...

Page 21: ...ting range 48 57 6V Cycle Life 6000 Physical Weight 52 kg Dimensions 475 x 446 x 200 mm Protection class IP20 Battery type LiFePO4 Operation Maximum charge discharge current 50A 0 5 C Temperature oper...

Reviews: