This instruction manual, including all parts there, is protected by copyright. The 
use  outside  of  copyright  requires  the  express  consent  of  the  company 

TURBO 

ENERGY S.L

. This applies to both copies, translations, microfilms, and storage on 

computer systems. As documents annexed to the manual, the installation and 
operation  manuals  of  the  reference  suppliers  relating  to  inverter  and  battery 
equipment are incorporated. The translations have been carried out by TURBO 
ENERGY S.L. being the intellectual property of the manuals of the corresponding 
suppliers.   

Editor: 

Turbo Energy S.L.  

 

Important note

: The satisfaction of the end user will depend heavily on having 

made an adequate estimate of the demand, power, and energy, present and 
future, to which the equipment will be subjected. Improper calculation may not 
provide adequate and sufficient service.   

Safety recommendations:  

Please  read  the  following  information  carefully  before  installing  and 
implementing the product. The installation and commissioning of the system must 
comply  with  the  Electrotechnical  Low  Voltage  Regulation  (REBT),  and  its 
complementary technical instructions, specifically, the ITC_BT 03, 04, 05 and 40, 
and the rest of the current regulations, either locally or regionally. Non-compliant 
use, use of the product in applications and/or configurations not in accordance 
with  this  manual,  and/or  modifications  during  assembly  will  result  in  warranty 
cancellation and all liability will be disclaimed.   

Solar energy systems must be grounded (lightning protection).  

Electrical connections must be made exclusively by a specialist technician.   

This manual is intended to be a document that facilitates the correct installation 
of the SunBox equipment. However, once installed it is important to pay attention 
to the monitoring of maintenance instructions in order to maintain over time the 
functional and aesthetic characteristics inherent in the installation.   

The correct use and the compliance with the maintenance requirements to be 
performed will depend heavily on the inevitable rate of aging of the installation. 
Similarly,  the  manufacturer  will  only  assume  responsibility  if  the  equipment  has 
defects of origin and will recline it if equipment contained in this manual is not 
maintained, or does not use manufacturer-approved spare parts.  

Please read this manual carefully before starting the installation. 

Summary of Contents for SunBox H

Page 1: ...Instruction manual SunBox Model H...

Page 2: ...nd its complementary technical instructions specifically the ITC_BT 03 04 05 and 40 and the rest of the current regulations either locally or regionally Non compliant use use of the product in applica...

Page 3: ...ons for setting up strings 6 4 2 Preliminary recommendations for installation 6 4 3 DC wiring 10 4 4 AC wiring 10 4 5 Grounding 10 4 5 Recommendations for batteries installation 11 4 5 Commissioning 1...

Page 4: ...o Hybrid Inverter Series Model 5000 48 o Batteries Lithium Series 5 1kWh 2 Description and operation Description The SunBox consists of a mounted and wired cabinet prepared to include up to 2 Turbo En...

Page 5: ...way energy is accumulated for later use at times when energy production is not sufficient 2 When the demand for electricity consumption exceeds the energy produced by photovoltaic panels the Inverter...

Page 6: ...n the end the Inverter performs the energy balancing functions and ensures the operation of the system 2 Back Up mode It is a mode that ensures that when the grid fails the critical loads connected co...

Page 7: ...Wh DoD 90 Cycles at 90 DoD 6000 Manufacturer Cells CATL Cells Metal Can Type of technology LiFePO4 Nominal battery voltage 51 2V Max current Loading Unloading 50A Communication with BMS CAN Batteries...

Page 8: ...ept dry and avoid potentially flooded areas The operating temperature range should be considered which must not exceed 50 C or be less than 0 C Take appropriate measures to ensure the operating temper...

Page 9: ...mm2 hose In case batteries need to be installed the SunBox model H comes ready to store up to 2 Turbo Energy Lithium Series 5 1kWh batteries Its installation is explained below The Network and Back u...

Page 10: ...parate the general loads top of the image and the back up loads bottom Therefore for easier connection and to avoid handling of the connections of the installation loads the following configuration is...

Page 11: ...from causing momentary power outages it is proposed to place an automatic switch that allows network power without going through the SunBox The SunBox Model H is not prepared to withstand excessively...

Page 12: ...l the installation is complete 4 4 AC wiring To connect Grid Back up and Ez meter open the back door of the Model H cabinet and connect to the pointed and identified terminals with colors phase gray n...

Page 13: ...is turned off and has no grid connection 2 Make sure the battery is also turned off 3 Set up battery switches as follows 4 Place the battery in the capsule structure with the corresponding screws 5 I...

Page 14: ...with all connections the machine is ready to commission It will proceed as follows 1 Reset the DC and AC protections at the back of the cabinet 2 Start the Batteries To do this press the Power button...

Page 15: ...iled information refer to the HIS 5000 48 Inverter Manual 6 Security measures To ensure proper installation it is recommended i Use safe mounting tools and install safety devices Use healthy stairs an...

Page 16: ...rent in the presence of solar radiation and verified that the rest of the lines do have contact technical service 8 Troubleshooting Carefully review the content of Page 10 of the Battery Manual Page 2...

Page 17: ...TECHNICAL DATA SHEETS APPENDIX INVERTER CHARGER BATTERIES...

Page 18: ...https www turbo e com Technical data Hybrid Inverter Series 3600 48 and 5000 48 https www turbo e com HYBRID INVERTER WITH BACK UP MODE MAXIMUM CUSTOMER SATISFACTION 5 years...

Page 19: ...artup voltage 150V Max input current A 11A 11A N MPPTs 2 Strings per MPPT 1 1 Output data CA Nominal Power W 3600W 5000W Max Power W 3960W 5500W Peak Power Offgrid Twice the Nominal Power 10S Max Back...

Page 20: ...https www turbo e com Technical data Battery Lithium Series 48V 5 1 kWh LONG LASTING LITHIUM ION BATTERIES MAXUMUM CUSTOMER SATISFACTION PLUG PLAY years 10 years https www turbo e com...

Page 21: ...ting range 48 57 6V Cycle Life 6000 Physical Weight 52 kg Dimensions 475 x 446 x 200 mm Protection class IP20 Battery type LiFePO4 Operation Maximum charge discharge current 50A 0 5 C Temperature oper...