8
The overall connection of the SunBox will remain as shown in the following
scheme:
In this case, you must separate the general loads (top of the image) and the
back-up loads (bottom). Therefore, for easier connection and to avoid handling
of the connections of the installation loads, the following configuration is
proposed:
In this way, all the power of the network passes through the equipment and it
distributes the power.