FIG. 9
Secure the
Top Pulley Assembly (#5)
to the
Front
Upright (#3)
using two Hex Head Cap Screws 3/8 -16 X 4 1/4
(#99) four Flat Washers SAE 3/8 (#90) and two Nylon Insert
Lock Nuts 3/8-16 (#86). Next, secure the
Top Pulley
Assembly (#5)
onto the
Rear Upright (#4)
using one Hex
Head Cap Screw 3/8-16 X 3 (#94), two Flat Washers SAE 3/8
(#90) and one Nylon Insert Jam Lock Nut 3/8 -16 (#86).
Note
:
This bolt should be placed in the top hole of the
Rear Upright
(#4)
.
FIG. 10
Next, attach the
Pec Dec Housing (#18)
to the
Rear Upright (#4)
. secure this assembly using one Hex Head
Cap Screw 3/8 -16 X 3 1/2 (#8), two Flat Washers SAE 3/8
(#90) and one Nylon Insert Jam Lock Nut 3/8-16 (#86).
Note
:
This bolt should be placed in the top hole of the
Pec Dec
Housing (#18)
. Next, install one Hex Head Cap Screw 3/8-16
X 3 (#94), two Flat Washers SAE 3/8 (#90) and one Nylon
Insert Jam Lock Nut 3/8 -16 (#86) th rough the lower hole of the
Pec Dec Housing (#18)
. Finally, install the
Rubber Stopper
(#62)
and two Plastic Insert Caps 2 Sq. (#64), as shown
above.
FIG. 11
Attach the
Pec Dec Arm (#7)
to the
Pec Dec Arm/
Cam Support (#13)
and secure it using one Hex Head Cap
Screw 1/2-13 X 3 (#98), two Flat Washers SAE 1/2 (#89) and
one Nylon Insert Jam Lock Nut 1/2-13 (#88). Repeat this
procedure for the opposite Pec Dec Arm Assembly.
Note
: It is
recommended that the axle on the
Pec Dec Arm (#7)
be
lubricated with grease prior to assembly.
FIG. 12
Mount the assembled
Pec Dec Arms (#7)
in
Fig.11
to the
Pec Dec Housing (#18)
axles, as illustrated.
Note
: It is recommended that the
Pec Dec Housing (#18)
axles be lubricated with grease prior to assembly
. Next, mount
the two
Pec Dec Cams (#9)
onto the the axles of the
Pec Dec
Housing (#18)
, as shown above.
Owners’ Manual: Assembly Instructions
MSL-IV Muscle IV Home Gym
4
Summary of Contents for MSL-IV
Page 20: ...MSL IV Muscle IV Home Gym 19 ...