FIG. 45
Attach a Nylon Pulley 4 1/2 Rd. (#35) to the
Front Upright (#3)
and secure it using one Hex Head Cap
Screw 3/8-16 X 3 3/4 (#75), two Flat Washers SAE 3/8 (#90),
one Nylon Insert Jam Lock Nut 3/8-16 (#86) and one
Cable
Retainer Bracket (#111)
. Then continue to route the
Lat
Cable (#14)
over the pulley as shown. Refer to
Fig. 1
on page
17 and
Fig. B
on page 18 for further detailed illustration of this
cable routing.
FIG. 46
Assemble the
Double Pulley Plates 1/8 X 2 X 9
(#21)
using two Nylon Pulleys 4 1/2 Rd. (#35), two Hex Head
Cap Screw 3/8-16 X 1 3/4 (#79), four Flat Washers SAE 3/8
(#90) and two Nylon Insert Jam Lock Nuts 3/8-16 (#86). Refer
to
Fig. 1
on page 17 for further detailed illustration of this
cable routing. Next, route the
Lat Cable (#14)
through the
Double Pulley Plates 1/8 X 2 X 9 (#21)
, as shown above.
Note
: The four holes on the
Double Pulley Plates 1/8 X 2 X 9
(#21)
are used to adjust the cable tension once the cable
routing has been completed.
FIG. 47
Insert a Nylon Pulley 4 1/2 Rd. (#35) into the
Adjustable Pulley Bracket (#26)
and secure it using one Hex
Head Cap Screw 3/8-16 X 1 3/4 (#79), two Flat Washers SAE
3/8 (#90) and one Nylon Insert Jam Lock Nut 3/8 -16 (#86).
Route the
Lat Cable (#14)
through the
Adjustable Pulley
Bracket (#26)
, as shown above.
FIG. 48
Attach the
Lat Cable (#14)
to the
Top Plate /Selecto
Bar (#58)
and secure it using one Split Bolt 1/2-13 X 1 (#51) an
one Split Washer 1/2 (#82). Refe r to
Fig. E
on page 18 for
further detailed illustration of this assembly.
Note
: Be sure this
hardware assembly is securely fastened.
MSL-IV Muscle IV Home Gym
13
Summary of Contents for MSL-IV
Page 20: ...MSL IV Muscle IV Home Gym 19 ...