T
T
T
TOTEM 2
OTEM 2
OTEM 2
OTEM 2
13
2-4: Fitting the first level:
Remove the pins from the bases of the ladders to be added
(extra ladders for 1
st
floor heights ≥ 2m)
:
Depending on the case, follow the configurations given in the diagram in chapter 1-4 by stacking the right combination of
ladders to reach the level you require for the first work surface.
Do not forget to put the pins back into place in order to make the assembly secure and to prevent any elements from
slipping apart by accident!
(E.g. Single work surface 3 m scaffolding)
Positioning stabilizers, clamped onto the uprights with two clips.
1m
1m
2m
To avoid losing pins, put
them in place on the
first rung.
Summary of Contents for 180-250-300
Page 18: ...T T T TOTEM 2 OTEM 2 OTEM 2 OTEM 2 18 2 7 Le montage du plateau 1 2 3...
Page 22: ...T T T TOTEM 2 OTEM 2 OTEM 2 OTEM 2 22 1 2 3...
Page 26: ...T T T TOTEM 2 OTEM 2 OTEM 2 OTEM 2 26 1M maxi...
Page 49: ...T T T TOTEM 2 OTEM 2 OTEM 2 OTEM 2 18 2 7 Fitting the work surface 1 2 3...
Page 53: ...T T T TOTEM 2 OTEM 2 OTEM 2 OTEM 2 22 1 2...
Page 54: ...T T T TOTEM 2 OTEM 2 OTEM 2 OTEM 2 23 3...