![Tsun TSOL-ACU3.0K User Manual Download Page 45](http://html1.mh-extra.com/html/tsun/tsol-acu3-0k/tsol-acu3-0k_user-manual_1178520045.webp)
43
5) Click “Authorize Users” and authorize this plant to the End User.
If the end user doesn’t have an account, click “create a New User” and create a new
account for the end user.
6.6 Shut Down the System
System shall be turned OFF in the correct sequence as follows:
1) Turn OFF the Battery switch on the right side of the ACU/ Expansion Battery.
2) Press (approx. 5 seconds) the BMS switch on the right side of the ACU/ Expansion
Battery until the BMS switch is off (not light in blue).
3) Disconnect the external grid AC switch.
Note
!
If the ACU is connected with Expansion Battery(s), the procedure for
turning off the system will be Battery No.3>> Battery No.2>> Battery
No.1>> ACU.
Summary of Contents for TSOL-ACU3.0K
Page 1: ...31 TSOL ACU3 0K...
Page 44: ...42 4 Click Add a New Gateway Logger and input the SN of the monitor logger...
Page 49: ...47...