![Tsun TSOL-ACU3.0K User Manual Download Page 28](http://html1.mh-extra.com/html/tsun/tsol-acu3-0k/tsol-acu3-0k_user-manual_1178520028.webp)
26
1) Remove the cover plate of the ACU.
2) Open the Grid_CT by pushing the buckle on its side.
3) Lead the Live of the Grid through the Grid_CT.
4) Tighten up the Grid_ CT buckles.
5) Open the PV_CT by pushing the buckle on its side.
6) Lead the Live of PV through the PV_CT.
7) Tighten up the PV_CT buckles.
8) Lead RJ45 plug of the CT line to pass through waterproof (CT/METER) nut on the
ACU and connect the plug to CT/Meter port on the PCBA of the ACU;
Pin Number
Effect
Pin Number
Effect
1
NC
5
NC
2
NC
6
NC
3
NC
7
RS485A
4
NC
8
RS485B
Summary of Contents for TSOL-ACU3.0K
Page 1: ...31 TSOL ACU3 0K...
Page 44: ...42 4 Click Add a New Gateway Logger and input the SN of the monitor logger...
Page 49: ...47...