![Tsun TSOL-ACU3.0K User Manual Download Page 30](http://html1.mh-extra.com/html/tsun/tsol-acu3-0k/tsol-acu3-0k_user-manual_1178520030.webp)
28
After installation, please set the meter (Grid side) address into 1 and set the meter
address (PV side) address into 2. (Please refer to section 5.6.3.2 for setting methods.)
Usually the default address of meter (Grid side) is 1.
5.6.2.2 One Three Phase Meter
In a single-phase grid & single phase PV system, one unit of three-phase meter shall be
used to sample voltage and current.
Phase C of the meter is used to sample voltage and current value of the PV side, while
Phase A of the meter is used to sample voltage and current value of the grid side.
Please install the 3-phase meters with reference diagram as showed below.
Summary of Contents for TSOL-ACU3.0K
Page 1: ...31 TSOL ACU3 0K...
Page 44: ...42 4 Click Add a New Gateway Logger and input the SN of the monitor logger...
Page 49: ...47...