Set up 

㸯㸰㸬㸯

  Setting before the motor start 

Current 

Set the rated motor current  

 

Start time 

Set 3 sec 

 

Shock time 

Set minimum data(0.2 sec)  

 

㸯㸰㸬㸰

  Start time setup value 

1) Start the motor 
2) In case that relay does not operate by above setup value, set shortest value without trip. 
3) In case that relay operates, set proper values that relay does not operate. 

㸯㸰㸬㸱

 Current setup value 

1) Start the motor and actual current. 
2) Set little higher values than actual current. Check that relay does not operate in this 

time. 

㸯㸰㸬㸲

  Shock time setup value 

1) Relay does not operate by instant over load 
2) Check the user’s machine and set shortest value. 

㻯㼍㼡㼠㼕㼛㼚㼟㻌㼣㼔㼑㼚㻌㼛㼜㼑㼞㼍㼠㼕㼚㼓㻌㼢㼛㼘㼡㼙㼑㻌㼗㼚㼛㼎㼟㻌 㻌

ە

When operating volume knobs, please use small screw driver and avoid 

applying excessive pressure. There is rrisk of knob damage.   

ە

 

Knob turning angle is 270

r

.    Please adjust within the range   

of MIN fully left) and MAX (fully right) with moderate pressure. 

There is rrisk of knob damage. 

13

Trouble shooting 

Phenomenon 

Check item 

Check result 

Treatment 

LED indication isn't 
turned on 

Wiring of the power source 
(A1-A2) 

It isn't being wired 

It is wired properly. 

Check a power source 
voltage (A1-A2) by voltage 
tester 

It is different from proper 

 

supply voltage 
TSBED

㻌 䠖

24

240V 

A proper power supply is input. 

Relay does not trip even 
if current setting value is 
minimum. 

Shock Relay Model No. 

Model No. is different 

Exchange Shock Relay 

Ratio of external CT 

Ratio of external CT is wrong   Ratio is made correct. (CT

The number of penetration) 

Depress TEST button 

Relay does not trip 

Exchange Shock Relay 

After the start, over-load 
trip occurs.  

Load of motor 

Over-load 

Motor capacity is reexamined.  

Inertia is too big.  

Start time setup value is 
examined. 

It is too short 

It is set up a little long.  

Current setup value is 
examined. 

It is too small 

Proper value is established. 

Over-load trip occurs 
though it is not an 
over-load.  

Current setup value.  

It is too small.  

Proper value is established.  

Shock time setup value 

It is too short.  

Proper value is established.  

Over-load trip doesn't 
occur  in spite of the 
over-load.  

Current setup value 

It is too big.  

Proper value is established. 

Shock time setup value 

It is too long. 

Proper value is established. 

Ratio of external CT 

Ratio of external CT is wrong 

Ratio is made correct.  

If replacement of the shock Relay is necessary, please make contact with our compan y office. 

㻔㻭㻕㻌

㻔㻿㻕㻌

㻔㻭㻕㻌

㻔㻿㻕㻌

㻔㻭㻕㻌

㻔㻿㻕㻌

 

 

!

 

 

 

!

 

 

Turning angle 270

r

Summary of Contents for TSB020ED

Page 1: ...hly before installing wiring operating and inspecting this SHOCK RELAY Please make sure that this instruction manual accompanies the SHOCK RELAY to the end user Please keep this instruction manual saf...

Page 2: ...his instruction manual the rank of safety requirements is divided into WARNING and CAUTION Death or serious injury may result from product misuse due to not following the instructions Minor or moderat...

Page 3: ...operation Electric Shock Risk The wiring operation maintenance check of Shock Relay must be performed by workers with expertise Electric Shock Injury Fire Risk CAUTION In case the instruction manual i...

Page 4: ...model and specification conform to what you ordered Check to see no damages occurred during the delivery Package Shock Relay Instruction Manual Model Identification 4 Demensions Maximum Motor Capacit...

Page 5: ...4 5 Specifications...

Page 6: ...ent CAUTION Keep Shock Relay free from lint paper wooden chips dirt dust metal scrap etc Fire Accident Risk CAUTION Avoid usage in the corrosive gas environment Sulfide gases SO2 H2S corrode cooper an...

Page 7: ...3 Never contact the output of an inverter or a servo driver to terminal A1 A2 4 Install an insulation transformer between the power line and terminal A1 A2 of the Shock Relay when harmonic noise is i...

Page 8: ...ass the main winding line 4 If the capacity of the operating electromagnetic coil of the electromagnetic contactor is above 200VA during closing time or 20VA during holding time then drive a secondary...

Page 9: ...reen when a preset VR is turned Trip relay will be energized when current exceeds Current Level and goes on beyond Shock Time Dip Switch TEST Button When LED indication is a current value if TEST Butt...

Page 10: ...y movement Locked Motor Trip Current value and set current are displayed when A is indicated Start time and shock time set up are displayed when s is indicated LVSOD 95 96 95 96 A M A M 97 9 1s 97 98...

Page 11: ...Shock time monitor screen indicates o Over load trip After over load trip monitor screen indicates o Monitor screen keeps Actual current at over load trip in case that Dip switch is set to M Manual re...

Page 12: ...e machine It kept being charged with electricity beyond 200 of the CURRENT setup value after the start during the sum of the start time and 0 2 sec Check whether there is a wrong point in the machine...

Page 13: ...ed properly Check a power source voltage A1 A2 by voltage tester It is different from proper supply voltage TSBED 24 240V Aproper power supply is input Relay does not trip even if current setting valu...

Page 14: ...the 2 1 1 General Standard of Ordinance on Labor Safety and Hygiene 16 Daily check LED lights when Shock Relay is power on 17 Periodic check Check whether there is any looseness in the installation o...

Page 15: ...Costs to reimburse any profit loss due to any repair or damage and consequential losses caused by the Buyer 18 3 Warranty with charge Seller will charge for any investigation and repair of Goods caus...

Page 16: ...aki Power Transmission LLC http www ustsubaki com Taiwan Tsubakimoto Co http tsubakimoto com tw Tsubaki of Canada Limited http tsubaki ca Tsubakimoto Chain Shanghai Co Ltd http tsubaki cn Tsubaki Aust...

Reviews: