14. Reset procedure for trip operation

 

(1)

 

Confirm content indication on LED when trip occurs.(Refer to page 8) 

(2)

 

Confirm if machine, connection and power supply have any abnormal. 

(3)

 

If there is anything abnormal, remove its roots and set to right situation. 

(4)

 

In case holding relay output, push Check/Reset button or turn off Shock 

relay. 

(5)

 

After confirming (1), (2), (3) and (4), restart the machine. 

 

15.

 

In the case of the maintenance, the check work

 

Maintenance and check must be performed in accordance with the following 
matters. 

(1)In the external circuit withstand voltage test, do not apply test voltage on 

Shock Relay. 

(2)To prevent an accident, keep the surrounding area clean and safe.   
(3)Power off before the installation / connection of Shock Relay 
(4)Comply with the 2-1-1 General Standard of “Ordinance on Labor Safety and 

Hygiene “. 

 

16

Daily check 

LED lights when Shock Relay is power on. 

 

17

. Periodic check 

䠄䠍䠅

Check whether there is any looseness in the installation of the Shock Relay and current 
transformer. (Every six months) 

䠄䠎䠅

Check relay output function by pressing the TEST button until it trips. (Every six 
months) 

䠄䠏䠅

Check relay output function by dialing CURRENT knob counterclockwise during motor 
operation. (Every six months) 

䠄䠐䠅

In the megger test, DC500V needs to be applied on the earth connection and circuit. 

䠄䠑䠅

In the external circuit withstand voltage test, do not apply test voltage on Shock Relay. 
Same is with CT. 

䠄䠒䠅

The typical life span of electrolytic capacitor is about 10 years at an average ambient 
temperature of 30

Υ

. It is recommended to overhaul or exchange for a new one before 

trouble occurs.  

Perform the periodic inspection during trial operation, and when the equipment was moved, 
and when the wiring was changed. 

 
 
 
 
 
 
 
 

 

 

!

 

 

 

!

 

 

 

!

 

 

 

!

 

 

 

!

 

 

 

!

 

 

 

!

 

 

 

!

 

Summary of Contents for TSB020ED

Page 1: ...hly before installing wiring operating and inspecting this SHOCK RELAY Please make sure that this instruction manual accompanies the SHOCK RELAY to the end user Please keep this instruction manual saf...

Page 2: ...his instruction manual the rank of safety requirements is divided into WARNING and CAUTION Death or serious injury may result from product misuse due to not following the instructions Minor or moderat...

Page 3: ...operation Electric Shock Risk The wiring operation maintenance check of Shock Relay must be performed by workers with expertise Electric Shock Injury Fire Risk CAUTION In case the instruction manual i...

Page 4: ...model and specification conform to what you ordered Check to see no damages occurred during the delivery Package Shock Relay Instruction Manual Model Identification 4 Demensions Maximum Motor Capacit...

Page 5: ...4 5 Specifications...

Page 6: ...ent CAUTION Keep Shock Relay free from lint paper wooden chips dirt dust metal scrap etc Fire Accident Risk CAUTION Avoid usage in the corrosive gas environment Sulfide gases SO2 H2S corrode cooper an...

Page 7: ...3 Never contact the output of an inverter or a servo driver to terminal A1 A2 4 Install an insulation transformer between the power line and terminal A1 A2 of the Shock Relay when harmonic noise is i...

Page 8: ...ass the main winding line 4 If the capacity of the operating electromagnetic coil of the electromagnetic contactor is above 200VA during closing time or 20VA during holding time then drive a secondary...

Page 9: ...reen when a preset VR is turned Trip relay will be energized when current exceeds Current Level and goes on beyond Shock Time Dip Switch TEST Button When LED indication is a current value if TEST Butt...

Page 10: ...y movement Locked Motor Trip Current value and set current are displayed when A is indicated Start time and shock time set up are displayed when s is indicated LVSOD 95 96 95 96 A M A M 97 9 1s 97 98...

Page 11: ...Shock time monitor screen indicates o Over load trip After over load trip monitor screen indicates o Monitor screen keeps Actual current at over load trip in case that Dip switch is set to M Manual re...

Page 12: ...e machine It kept being charged with electricity beyond 200 of the CURRENT setup value after the start during the sum of the start time and 0 2 sec Check whether there is a wrong point in the machine...

Page 13: ...ed properly Check a power source voltage A1 A2 by voltage tester It is different from proper supply voltage TSBED 24 240V Aproper power supply is input Relay does not trip even if current setting valu...

Page 14: ...the 2 1 1 General Standard of Ordinance on Labor Safety and Hygiene 16 Daily check LED lights when Shock Relay is power on 17 Periodic check Check whether there is any looseness in the installation o...

Page 15: ...Costs to reimburse any profit loss due to any repair or damage and consequential losses caused by the Buyer 18 3 Warranty with charge Seller will charge for any investigation and repair of Goods caus...

Page 16: ...aki Power Transmission LLC http www ustsubaki com Taiwan Tsubakimoto Co http tsubakimoto com tw Tsubaki of Canada Limited http tsubaki ca Tsubakimoto Chain Shanghai Co Ltd http tsubaki cn Tsubaki Aust...

Reviews: