4
STEP 4: INSTALLING THE TOP COVER
Shut the tailgate and pull the rails back until the tailgate cap seals have good engagement
with your tailgate. A good way to check for proper engagement is to make sure the bottom
cap and tailgate have a 6mm gap (FIG 4A).
FIG. 4A
Tailgate
Bottom Cap
Tailgate
Cap Seal
The Rail shown is for
REFERENCE and may
not exactly match your
particular Rail geometry.
Canister Groove
Left Rail
Flat Washer
Lock Washer
Rail Screw
Canister
FIG. 3G
BLACK TOP COVER
SCREW x 2
180cm OF FOAM
INSTALLATION
TOOL x 1
FIG. 4C
Another way to set the tailgate cap seals is to use
the Tailgate Seal Gauge as shown in figure 4B &
4C. You should be able to just slide the Tailgate
Seal Gauge in between the Tailgate Cap Seal and
the Bottom Cap.
WARNING: Proper Tailgate Cap Seal
Engagement is important for getting the best
possible water resistance out of your cover!
BR Gauge
Tailgate Seal
Gauge
FIG. 4B
FIG. 3F
Installing the rails is easier with the handle latches
in. For information on handle operation reference
Figure 11A.
Latches In
Latches Out
6mm
UNCONTROLLED
DOCUMENT