![Truckman Roll-Top Xtreme Installation Instructions Manual Download Page 7](http://html.mh-extra.com/html/truckman/roll-top-xtreme/roll-top-xtreme_installation-instructions-manual_1173988007.webp)
6
Once the clamps are lightly tightened,
measure the Between-the-Rail dimension at
the front and rear of the truck (FIG. 5E).
Another way to ensure proper fit is to check
the side to side play of the handle assembly
at the canister and at the tailgate end of the
rails. There should be, at the minimum,
enough play to allow the cover to move
freely with no drag and at a maximum 3mm
per side. If you push the cover you one side
you should not be able to fit the Between-the
-Rail gauge between the Rail metal and
Handle Stop on the opposite side. More than
3mm per side may result in the cover
opening unintentionally and in severe cases
it may fall between the rail tracks and
damage the cover.
There are “Stick on
Shims” in the hardware pack that can be
added to the brackets if too loose.
Part number is on the
serial number label in
the upper left corner of
the canister (looking
from tailgate).
Rail
Metal
Handle
Stop
FIG. 5F
Slide the 4 Grip pieces on the rails as shown in Figure 6A. Position The Grip piece so that it is just beyond the
Relief Machining Figure 6B. Kickstands should go on the Tailgate and canister end of each rail (FIG. 6C).
STEP 6: INSTALLING THE RAIL KICKSTANDS
Grip
Rail
FIG. 6B
FIG. 6A
Relief Machining
BR Front
BR Rear
FIG. 5E
TAILGATE END
CANISTER END
FIG. 6C
PART
BETWEEN
NUMBER
THE RAILS
AR and AM2083 54 1/16 (137.3 cm)
BTR
UNCONTROLLED
DOCUMENT