Operating manual RM-O-3-D / Technical leaf let no. M375DD8 (05/2018)
8
1 1 PageHeaderToc
6
I n s t al l at i on
I n s t al l at i on i n f i re dam p er F K - E U
The RM-O-3-D d uct smok e d etector can be in-
stalled into the inspection access of F K -EU f ire
d ampers. F or the ex act position see the illustration
on the right.
I f F K -EU is used as an air transf er d amper accord -
ing to general build ing inspectorate licence
Z-6.50-2031:
I nstall the RM-O-3-D d uct smok e d etector in the
upper inspection access of the f ire d amper.
Proceed as f ollow s:
1.
③
②
④
panel is used f or centering).
2. Remov e the inspection access panel by turning
and lif ting it.
3.
①
⑤
ad apter.
4. Connect the f ire d amper electrically to the d uct
smok e d etector, siehe „ Elek trische I nstallation“
auf Seite 10.
N ot e:
Old er F K -K 90 and F K -EU f ire d ampers may hav e
an inspection access panel mad e of metal.
I n this case you can remov e the inspection access
panel and install the d uct smok e d etector w ith
w ashers and w ing nuts in the f ire d amper (no
ad apter req uired ).
①
②
d amper
③
G alv anised : A00000043410
Stainless steel:
A00000043411
④
⑤
①
③
④
②
⑤
I n s t al l at i on i n F K - E U
H 200
– 320
H 200
– 800
I n s t al l at i on l ocat i on b as ed on h ei gh t
H