769-10
STEP 04
• Attach two Single Pulley Bracket (26) to brackets on Center Vertical Frame (8) using (M8 x 63mm) Hex Bolt (51),
(8mm) Washer (54) and (M8) Locknut (53).
• Attach Pulley (31) into Single Pulley Bracket (31) using (3/8” x l-3/4”) Hex Bolts (46), (3/8”) Washers (56) and (3/8”)
Locknuts(55).
• Install Pulley (31) into Floating Pulley Bracket (24), and insert one end of Butterfly Cable (42) under Pulley in Floating
Pulley Bracket (24) and over Pulley in Single Pulley Bracket (31) as shown.
• Attach eye end of Butterfly Cable (42) to RIGHT Butterflyarm (12) and Left Butterflyarm (13) using (3/8” x l”) Hex
Bolts (46), (3/8”) Washers (56) and (3/8”) Locknuts(55).
• Install Rubber Doughnut (59) to weight rod on the Base Frame (5).
• Attach Little Barbell Catch Assembly (14) and Big Barbell Catch Assembly (16) to Front Support Frame (7) as shown.
ASSEMBLY STEPS (CAGE)
17
14
7