Part 2: Kit
8. Fit the control panel to the wall
Install the remote control panel wall
mounting bracket within the showering
area. Fit the control panel onto the
bracket.
9. Operation
Operate the shower and set preferred
flow settings.
The following notes are given as the
suggested steps for installing the Satellites
mixer shower and remote control:
1. Site survey
Determine the position of all parts of
the shower (kit, mixing unit and control)
before starting the installation.
2. Fit the mixing unit
3. Install the appropriate riser rail
Having determined the position of the
mixing unit, decide on which riser rail
kit to use. Option 1 is for rear supply;
Option 2 and Option 3 are for a falling
supply.
4. Install the pipework and plumbing
Run the pipework from the mixing unit to
the chosen outlet. The rear supply will
terminate at the bulkhead position, while
a falling supply will terminate in the loft
at the top of the riser rail. Connect the
inlet pipework, the outlet pipework and
then the outlet fittings.
5. Electrical connections
Connect the mixing unit to the electrical
supplies.
6. Register the remote control panel
Register the control panel to the mixing
unit.
7. Commission the unit
Commission the shower and select the
desired feature settings.
GEnERal InSTallaTIon noTES
A video detailing the installation of the
Satellites mixer shower can be seen at
www.tritonshowers.co.uk.
A DVD is also available on request.
Contact the Brochure request line for
details on
024
7632
4460
To check the product suitability for commercial and multiple installations, please contact
Triton’s specification advisory service before installation.
Telephone: 0870
067 3767
Facsimile: 0870
067 3334
E mail: technical@trito
nshowers.co
.uk