12
Triple Solar assembly instruction PVT heat pump panels March 2020
6. Preparation for a flat roof
See the Sunbeam installation manual supplied with the Sunbeam flat roof mounting system
.
Attention:
Observe the ballast plan of the Sunbeam Calculator for the ballast distribution.
1) After assembling the Sunbeam mounting system, the Triple Solar mounting rails (#324200)
must be fixed to the Sunbeam triangles by means of cross connectors (#330250), see figure
5.1-a.
Figure 5.1-a cross connector which clamps the mounting rail to the Sunbeam mounting system
2) From here on, follow the general instructions for installing the panels, see chapter 7.