System calibration
Storm-OM-001
55
28 February 2020
This document, including the information contained herein, is proprietary to Triotech Amusement Inc.
•
Click on Done .
When the calibration is complete, you will need to confirm the calibration by double
cli
Confirm Calibration
Whenever a calibration modification is performed on the machine, the
Confirm
Calibration
icon will need to be double clicked on
BOTH
computers, otherwise
the Storm will not function properly.
Always reb
selected on the KVM.