TrinityHighway.com
38
Revision A August 2020
Maintenance and Repair
Important:
Inspections are recommended, as needed, based upon volume of
traffic and impact history. Visual Drive-By Inspections are recommended at least
once a month. Walk-Up Inspections are recommended at least once a year.
Visual Drive-By Inspection
1) Encountering a system with the Hit Indicator in the vertical position mandates inspection
of the system. A walk-up inspection will be necessary.
2) Inspect the system in accordance with the QuadGuard
®
Elite M10 Wide Maintenance Flow
Chart (p. 40).
Caution:
It is important to inspect a system after it has been impacted even if it
appears to be self-restored and fully maintained. In particular, check the Fender
Panels/Diaphragm attachment bolts to be sure none have failed.
3) Be sure the Nose assembly is in place and in good condition.
4) Note the location and condition of the QuadGuard
®
Elite M10 Wide and the date of visual
drive-by inspection.
Walk-Up Inspection
Warning:
A system that has been impacted can store energy in collapsed
Cylinders and may spring back unexpectedly causing possible serious injury. Use
caution when inspecting, disassembling or restoring systems that are collapsed or
compressed by any amount.
Maintenance Checklist
1) Clear and dispose of any debris on the site. Check along length of Monorail and remove
any debris.
2) All bolts are tight and rust free.
3) Monorail Anchor Nuts are securely anchored.
4) Diaphragm Legs are straight.
5) All Mushroom Washer Assemblies are properly aligned and positioned (p. 43).
6) Fender Panels and Transition Panels should nest tightly against the system. For wrong
way traffic, the maximum gap allowed is 1.0” [25 mm].
7) All Cylinders are in good condition and are properly positioned within each Bay.
8) Always inspect system if the Hit Indicator is in the UP position even if it appears normal.
Summary of Contents for QuadGuard Elite M10 Wide
Page 1: ......
Page 47: ...TrinityHighway com 46 Revision A August 2020 QuadGuard Elite M10 Wide QFEMTSCVR U ...
Page 48: ...TrinityHighway com 47 Revision A August 2020 Backup Assembly Tension Strut 627528 ...
Page 49: ...TrinityHighway com 48 Revision A August 2020 Bay 1 Diaphragm Assembly 627506 ...
Page 50: ...TrinityHighway com 49 Revision A August 2020 Standard Diaphragm Assembly 627506 ...
Page 51: ...TrinityHighway com 50 Revision A August 2020 Fender Panel Assembly 608240 ...
Page 52: ...TrinityHighway com 51 Revision A August 2020 Cylinder Attachment 618879 ...
Page 53: ...TrinityHighway com 52 Revision A August 2020 Nose Assembly 627505 ...
Page 54: ...TrinityHighway com 53 Revision A August 2020 Hit Indicator 610237 ...
Page 55: ...TrinityHighway com 54 Revision A August 2020 Monorail Assembly 625637 ...
Page 56: ...TrinityHighway com 55 Revision A August 2020 TS Concrete Pad 618686 ...
Page 57: ...TrinityHighway com 56 Revision A August 2020 TS Concrete Pad 8 w Rebar ...
Page 58: ...TrinityHighway com 57 Revision A August 2020 TS Concrete Pad 8 wo Rebar ...
Page 59: ...TrinityHighway com 58 Revision A August 2020 31 W Beam Transition QFEMTSCVR TWLR ...
Page 60: ...TrinityHighway com 59 Revision A August 2020 Thrie Beam Transition QFEMTSCVR TTLR ...
Page 61: ...TrinityHighway com 60 Revision A August 2020 4 Safety Shape Transition QFEMTSCVR T4LR ...
Page 62: ...TrinityHighway com 61 Revision A August 2020 4 Safety Shape Flared Transition QFEMTSCVR T4LRF ...
Page 63: ...TrinityHighway com 62 Revision A August 2020 6 Single Slope Transition QFEMTSCVR T6LR ...
Page 64: ...TrinityHighway com 63 Revision A August 2020 6 Single Slope Flared Transition QFEMTSCVR T6LRF ...
Page 65: ...TrinityHighway com 64 Revision A August 2020 End Shoe Transition QFEMTSCVR ESLR ...
Page 66: ...TrinityHighway com 65 Revision A August 2020 Notes ...
Page 67: ...TrinityHighway com 66 Revision A August 2020 Notes ...
Page 68: ......