Horizontal Anchors
The horizontal approved adhesive kit is the same as the vertical kit.
Caution:
Fill borehole 100% full so it is even with the vertical concrete surface
per manufacturer’s instructions.
1) Follow the instructions supplied with your approved adhesive kit
Apply approved adhesive to each anchor per instructions.
2) Add the Washers and Nuts
Put washer and nut on stud so the
nut is flush with end of stud
.
3) Insert each Stud with Washer and Nut into Borehole
Push stud with washer and nut into borehole.
Important:
The stud should be flush with the top of the nut in both
vertical
and
horizontal
applications prior to tightening (Figure 9).
Caution:
Do not disturb or load the stud until the approved adhesive material has
hardened (reference approved adhesive kit instructions for hardening times).
4) Torque the nuts
Once the adhesive has fully cured, torque nut(s) to the approved adhesive manufacturer’s
specification.
Figure 9
Horizontal Application
(Before Applied Torque)
CORRECT
INCORRECT
Summary of Contents for QuadGuard Elite M10 Wide
Page 1: ......
Page 47: ...TrinityHighway com 46 Revision A August 2020 QuadGuard Elite M10 Wide QFEMTSCVR U ...
Page 48: ...TrinityHighway com 47 Revision A August 2020 Backup Assembly Tension Strut 627528 ...
Page 49: ...TrinityHighway com 48 Revision A August 2020 Bay 1 Diaphragm Assembly 627506 ...
Page 50: ...TrinityHighway com 49 Revision A August 2020 Standard Diaphragm Assembly 627506 ...
Page 51: ...TrinityHighway com 50 Revision A August 2020 Fender Panel Assembly 608240 ...
Page 52: ...TrinityHighway com 51 Revision A August 2020 Cylinder Attachment 618879 ...
Page 53: ...TrinityHighway com 52 Revision A August 2020 Nose Assembly 627505 ...
Page 54: ...TrinityHighway com 53 Revision A August 2020 Hit Indicator 610237 ...
Page 55: ...TrinityHighway com 54 Revision A August 2020 Monorail Assembly 625637 ...
Page 56: ...TrinityHighway com 55 Revision A August 2020 TS Concrete Pad 618686 ...
Page 57: ...TrinityHighway com 56 Revision A August 2020 TS Concrete Pad 8 w Rebar ...
Page 58: ...TrinityHighway com 57 Revision A August 2020 TS Concrete Pad 8 wo Rebar ...
Page 59: ...TrinityHighway com 58 Revision A August 2020 31 W Beam Transition QFEMTSCVR TWLR ...
Page 60: ...TrinityHighway com 59 Revision A August 2020 Thrie Beam Transition QFEMTSCVR TTLR ...
Page 61: ...TrinityHighway com 60 Revision A August 2020 4 Safety Shape Transition QFEMTSCVR T4LR ...
Page 62: ...TrinityHighway com 61 Revision A August 2020 4 Safety Shape Flared Transition QFEMTSCVR T4LRF ...
Page 63: ...TrinityHighway com 62 Revision A August 2020 6 Single Slope Transition QFEMTSCVR T6LR ...
Page 64: ...TrinityHighway com 63 Revision A August 2020 6 Single Slope Flared Transition QFEMTSCVR T6LRF ...
Page 65: ...TrinityHighway com 64 Revision A August 2020 End Shoe Transition QFEMTSCVR ESLR ...
Page 66: ...TrinityHighway com 65 Revision A August 2020 Notes ...
Page 67: ...TrinityHighway com 66 Revision A August 2020 Notes ...
Page 68: ......