TrinityHighway.com
23
Revision A August 2020
2) Anchor the Backup and Monorail
See Figure 18 (showing Backup Assembly) and Figure 20 (showing Monorail deployment).
Also refer to the drawing package and the approved anchoring instructions (p. 16).
Warning:
Location of the system is critical and dependent on the type of
Transition Panel used. Consult project plans supplied by the applicable highway
authority with the system for details.
Step 1.
Tension Strut Backup Assembly (Figure 18)
Locate the Backup and Monorail on the pad with the side of the Monorail on the
construction line (Figure 20). Verify that applicable Transition Panels fit properly before
anchoring the Backup. Drill 7/8” [22mm] diameter by 5 3/4” [146 mm] deep anchor holes
in the pad using the Backup as a template. Do not drill through pad. Anchor the Backup
to the concrete pad using approved adhesive kits (p. 16).
Step 2.
Monorail Assembly
Locate the Monorail on the construction line as shown in the Monorail Assembly drawings.
Drill 7/8” [22mm] diameter by 5 3/4” [146 mm] deep anchor holes using the Monorail as a
template (Figure 20). Do not drill through the pad. Anchor each Monorail section using the
provided approved adhesive kits (p. 16). It is important to attach each segment of Monorail
in alignment from the back to the front of the system (±1/4” [6 mm]).
Warning:
Improper alignment at the Monorail Splice Joints will prevent proper
system collapse during an impact.
Warning:
Every hole and slot in Backup and Monorail must have an approved
adhesive stud anchoring it.
Figure 18
Anchoring Tension Strut Backup to Foundation
APPROVED ADHESIVE
WITH 3/4X7 ANCHOR
Summary of Contents for QuadGuard Elite M10 Wide
Page 1: ......
Page 47: ...TrinityHighway com 46 Revision A August 2020 QuadGuard Elite M10 Wide QFEMTSCVR U ...
Page 48: ...TrinityHighway com 47 Revision A August 2020 Backup Assembly Tension Strut 627528 ...
Page 49: ...TrinityHighway com 48 Revision A August 2020 Bay 1 Diaphragm Assembly 627506 ...
Page 50: ...TrinityHighway com 49 Revision A August 2020 Standard Diaphragm Assembly 627506 ...
Page 51: ...TrinityHighway com 50 Revision A August 2020 Fender Panel Assembly 608240 ...
Page 52: ...TrinityHighway com 51 Revision A August 2020 Cylinder Attachment 618879 ...
Page 53: ...TrinityHighway com 52 Revision A August 2020 Nose Assembly 627505 ...
Page 54: ...TrinityHighway com 53 Revision A August 2020 Hit Indicator 610237 ...
Page 55: ...TrinityHighway com 54 Revision A August 2020 Monorail Assembly 625637 ...
Page 56: ...TrinityHighway com 55 Revision A August 2020 TS Concrete Pad 618686 ...
Page 57: ...TrinityHighway com 56 Revision A August 2020 TS Concrete Pad 8 w Rebar ...
Page 58: ...TrinityHighway com 57 Revision A August 2020 TS Concrete Pad 8 wo Rebar ...
Page 59: ...TrinityHighway com 58 Revision A August 2020 31 W Beam Transition QFEMTSCVR TWLR ...
Page 60: ...TrinityHighway com 59 Revision A August 2020 Thrie Beam Transition QFEMTSCVR TTLR ...
Page 61: ...TrinityHighway com 60 Revision A August 2020 4 Safety Shape Transition QFEMTSCVR T4LR ...
Page 62: ...TrinityHighway com 61 Revision A August 2020 4 Safety Shape Flared Transition QFEMTSCVR T4LRF ...
Page 63: ...TrinityHighway com 62 Revision A August 2020 6 Single Slope Transition QFEMTSCVR T6LR ...
Page 64: ...TrinityHighway com 63 Revision A August 2020 6 Single Slope Flared Transition QFEMTSCVR T6LRF ...
Page 65: ...TrinityHighway com 64 Revision A August 2020 End Shoe Transition QFEMTSCVR ESLR ...
Page 66: ...TrinityHighway com 65 Revision A August 2020 Notes ...
Page 67: ...TrinityHighway com 66 Revision A August 2020 Notes ...
Page 68: ......