34
System Setting
– Setting Smart Meter address
Smart Meter Address Setting:
Usually during the
first initialization
, the smart meter address
need to be changed.
1.
At the standard interface, long press the “OK” button for 3
seconds to
enter the setting menu
.
2. Input the
password “1111”
3. Choose
parameters
by
pressing “
▲
”, “
▼
” buttons. Go into
“
ADR
” which refers to smart meter address
4. Check the
address column
is the same as that
on smart
meter label
5. Press
“
▲
” or “
▼
” to change the 1
st
digit, press “OK” to
switch to next digit, after inputting the correct address,
press “OK”
Summary of Contents for PowerCube 2.0 DC
Page 1: ...PowerCube 2 0 DC Installation Guide Australia New Zealand Feb 2018 V1 5...
Page 3: ...System Introduction 01 System Topology Power Box DC PowerCube 2 0...
Page 5: ...5 Power Box DC Bess Hybrid Inverter Length 610mm Width 515mm Height 192mm Weight 30kg...
Page 7: ...Upacking the products 02 Battery Packs PowerCube 2 0 Casing Power Box...
Page 8: ...8 Battery Packs...
Page 12: ...12 Installation Tools Hammer Drill Recommend drill dia 8 10mm...
Page 14: ...14 System Connection Single Line Diagram TB5200SH internal wiring diagram...
Page 22: ...22 System connection Battery Modules 4 Packs Connection Wire Master Energy Meter...
Page 29: ...29 BESS installation Complete Note Sample Installation for reference...
Page 45: ......