BESS installation
– Hybrid inverter Connections
Connecting the inverter cables
1. Prepare the
AC Grid
and
Critical load connectors
.
2. Connect the
AC connectors
to the inverter.
3. Connect the
Anderson plug
to the
DC cables
4. Connect the
comms cable
to
RS485
port
5. Run the
battery comms cable
via
inverter comms conduit
to DB
6. Connect the
solar PV
cables
To powercube
Summary of Contents for PowerCube 2.0 DC
Page 1: ...PowerCube 2 0 DC Installation Guide Australia New Zealand Feb 2018 V1 5...
Page 3: ...System Introduction 01 System Topology Power Box DC PowerCube 2 0...
Page 5: ...5 Power Box DC Bess Hybrid Inverter Length 610mm Width 515mm Height 192mm Weight 30kg...
Page 7: ...Upacking the products 02 Battery Packs PowerCube 2 0 Casing Power Box...
Page 8: ...8 Battery Packs...
Page 12: ...12 Installation Tools Hammer Drill Recommend drill dia 8 10mm...
Page 14: ...14 System Connection Single Line Diagram TB5200SH internal wiring diagram...
Page 22: ...22 System connection Battery Modules 4 Packs Connection Wire Master Energy Meter...
Page 29: ...29 BESS installation Complete Note Sample Installation for reference...
Page 45: ......