28
BESS installation
– Main Switchboard connections
Connecting Wires from BESS DB
Step 1
: Connect the
Critical Loads
circuits
Step 2
: Connect
energy meter circuits
(an
AC Circuit Breaker
may be needed
for local wiring requirements)
Step 3:
Connect energy meter to
main
circuit breaker
Step 4:
Connect
Normal loads
to energy
meter circuits
Step 5
: Connect
Earth
circuit
E
L
N
Critical Load
L
N
Energy Meter
To Energy Meter
C
ritic
al
Loads
Main
C
B
Main Cir
cu
it
b
reak
er
Critical Load(s)
L
N
Utility Meter
N
L
Normal Loads
N
or
mal
Loads
Main CB
L
N
Energy Meter
Summary of Contents for PowerCube 2.0 DC
Page 1: ...PowerCube 2 0 DC Installation Guide Australia New Zealand Feb 2018 V1 5...
Page 3: ...System Introduction 01 System Topology Power Box DC PowerCube 2 0...
Page 5: ...5 Power Box DC Bess Hybrid Inverter Length 610mm Width 515mm Height 192mm Weight 30kg...
Page 7: ...Upacking the products 02 Battery Packs PowerCube 2 0 Casing Power Box...
Page 8: ...8 Battery Packs...
Page 12: ...12 Installation Tools Hammer Drill Recommend drill dia 8 10mm...
Page 14: ...14 System Connection Single Line Diagram TB5200SH internal wiring diagram...
Page 22: ...22 System connection Battery Modules 4 Packs Connection Wire Master Energy Meter...
Page 29: ...29 BESS installation Complete Note Sample Installation for reference...
Page 45: ......