APPENDIX C:     TROUBLESHOOTING

WARNING

.

Servicing Instructions: “Warning - These servicing instructions are for use by qualified 

personnel only.

To reduce the risk of electric shock, do not perform any servicing other than that 

specified in the operating instructions.”

WARNING

.

Troubleshooting the PV array or the Trinasmart Module Optimizers should be 

completed only by qualified personnel. Do not disconnect PV connectors under load.

WARNING

.

The Module Optimizers contain no user-serviceable parts. Do not attempt to open 

the enclosure. Tampering with or opening the Module Optimizer will void the factory 

warranty. See warranty for instructions on obtaining service.

Troubleshooting the Gateway connection

The Gateway has an LED light at the bottom of the unit, which shows the status of the Gateway. This is useful for 
troubleshooting problems with the system communications. See the table below for the meaning of each light pattern:

Color pattern

Gateway Status

No color

Not powered from MMU

Solid blue

Powered, but not communicating

Blue and yellow (blinking)

Powered and communicating with Maximizers

Discovery Process Error Messages

If error messages are displayed during the discovery process, see the table below for descriptions of the problem.

Error message

Description

Corrective action

“Err#1: X/Y”

MMU has only found X Gateways 
(was expecting to find Y)

Check Gateway cable connections, call Tigo Energy 
Support if problems persist

“Err#3: XXXX”
“Err#4: XXXX”
“Err#6: GW_XXXX err”
“Err#7: GW_XXXX err”
“Err#6: GW_XXXX err”
“Err#10: GW_XXXX err”
“Err#11: MM pos”
“Err#12: GW_XXXX err”
“Err#13: GW_XXXX err”

Failed Gateway communication 
during discovery, cannot find 
Gateway XXXX

Check Gateway cable connections, call Tigo Energy 
Support if problems persist

“Err#5: Chnl err”

Could not find free channel for 
Gateway

Contact Tigo Energy Support

Summary of Contents for Trinasmart

Page 1: ...Installation and Safety Manual TSM_Trinasmart_Installation and Safety Manual_2012_RevB...

Page 2: ...2 Installation and Safety Manual Trinasmart 3simple steps 1 Configure the System Before Going to the Site 2 Install the Management Unit and Gateway 3 Install the Optimizers and verify system...

Page 3: ...ng the Management Unit and Gateway 15 Verifying the System 17 Troubleshooting 23 Technical Specifications 25 per UL 1741 This symbol is used to indicate WARNING Failure to follow instructions may resu...

Page 4: ...PV module with or without the Trinasmart Optimizer attached Installation must be performed by trained professionals only Trina Solar does not assume liability for loss or damage resulting from imprope...

Page 5: ...nal management and performance monitoring In well designed large scale systems Trinasmart Optimizer systems will return up to 8 incremental power output while in residential or commercial systems with...

Page 6: ...the MMU will display PVSAFE PRESSED and Requesting to indicate the command has been sent to the Optimizers As the Optimizers are responding the MMU display will indicate how many have successfully dis...

Page 7: ...user ID password information if already established Installation schematic drawing Phillips and slotted screwdrivers MC4 type connectors 1 male 1 female per string Permanent marker or label maker Dete...

Page 8: ...8 Installation and Safety Manual Trinasmart IDENTIFYING PARTS OF THE TRINASMART OPTIMIZER SYSTEM Trinasmart Module Optimizer MM ES Gateway Management Unit MMU and Gateway cable...

Page 9: ...the Mac IDs from the Optimizers ready before beginning the configuration process Optimizer codes can be found on the outside of the box this is not recommended if box has been opened All identificati...

Page 10: ...wisted pair outdoor rated wire of at least 18AWG See Tigo Energy s website for a list of tested cable options Access the MMU communications ports by pressing the latch at the bottom edge of the clear...

Page 11: ...ight four pin connector in order to wire the outbound RS 485 cable to the next Gateway Only the final Gateway in the series connection should have a termination resistor When finished replace the cove...

Page 12: ...cuit do not use a separate or dedicated power supply DO NOT INITIATE DISCOVERY AND POWER ON UNTIL ALL OPTIMIZERS HAVE BEEN INSTALLED NOTE To verify if a connection has been made to the network the ins...

Page 13: ...ub Array 1 Sub Array 2 Sub Array 4 Sub Array 3 Gateway Gateway Terminated Gateway Position the Gateway at the center of the module cluster and attach to the upper left hand corner of a PV module frame...

Page 14: ...the modules from the Management Unit console Place this label in a visible location on the front surface of the Fuse Combiner Box typically found adjacent to the array in multi string projects AC Disc...

Page 15: ...modules return to the Management Unit and initiate the Discovery and Power On command which will also power on the Optimizers if they not powered on already Access this from the MMU display by selecti...

Page 16: ...communicate effectively with the Gateway By paying close attention to these warning messages the installer can locate the most ideal place for the Gateway to be able to communicate effectively with al...

Page 17: ...andard PV array Refer to the Troubleshooting section for instructions on verifying the system communication is operating properly Please ensure safety precautions are always observed in order to avoid...

Page 18: ...off 3 Push Data Immediately attempts to make another communication to transfer data to the data center without having to wait the usual 10 minute period between communications Useful for real time deb...

Page 19: ...ion can be wired with Cat 5 Ethernet wire The data feed leads A and B on the MMU and Gateway terminal blocks must be connected to the same twisted pair See the table for instructions on connecting the...

Page 20: ...e Gateway This is useful for troubleshooting problems with the system communications See the table below for the meaning of each light pattern Color pattern Gateway Status No color Not powered from MM...

Page 21: ...ccess the web via HTTPS proxy and server is not cooperating Verify proxy settings on MMU Verify proxy server allows access to https datacenter tigoenergy com Re initiate network test No default GW Mis...

Page 22: ...ressing ENTER 4 The next entry field will read SUBNET MASK AND AGAIN 000 000 000 000 Use the four keys as before to move and change the number values 5 The next entry field will read DEFAULT GATEWAY A...

Page 23: ...d if not installed and used in accordance with the instructions may cause harmful interference to radio communications However there is no guarantee that interference will not occur in a particular in...

Page 24: ...nt of ISC 0 053 C Input data MMJ ES50 Maximum Power 300W Maximum Input DC Voltage VOC 52V VMP Range 16 48V Maximum Continuous Current IMP 9 5A Maximum Input Current ISC 10A VMP Voltage at maximum powe...

Page 25: ...ie Street Sydney NSW 2000 t 61 2 8667 3088 f 61 2 8667 3200 e australia trinasolar com United Arab Emirates Trina Solar Middle East Ltd Office 306 Injazat Building Mohamed Bin Zayed City Abu Dhabi P O...

Reviews: