PowerHawk 6212, 6312 and 6412 meters
930-108-01-A.04
Installation
01/2011
© 2011 Triacta Power Technologies All Rights Reserved
14
For a three-phase wye panel (see Figure 8), connect:
•
Meter terminal A to the voltage disconnect phase A (red wire)
•
Meter terminal B to the voltage disconnect phase B (black wire)
•
Meter terminal C to the voltage disconnect phase C (blue wire)
•
Meter neutral terminal to neutral bar in the voltage disconnect panel
(white wire)
•
Earth wire to earth post using lug provided
Figure 8: PowerHawk meter 120/208V three-phase wye service
connection
Phase A (red)
Phase B (black)
Phase C (blue)
Neutral (white)
Earth
AUXA to A
shorting jumper
AUXN to N
shorting jumper
Terminal Block (J3)
0.75-inch (1.9-cm) Strain Relief
BX cable