930-108-01-A.04
PowerHawk 6212, 6312 and 6412 meters
01/2011
Installation
© 2011 Triacta Power Technologies All Rights Reserved
17
1.
Connect the 50-pin connector to the PowerHawk connector located at
the bottom side of the unit, and secure it in place with the retaining clips.
2.
Feed the free end of the cable through the bottom left of the meter
enclosure.
This cable is made up of twisted-pair wires for connecting the individual
CTs to the metered points. The color codes for the X1 (positive) and X2
(neutral) connections for each CT are listed in Table 2 on page 18.
NOTE: The direction of the energy flow is indicated on the CT.
3.
Turn off the power feed to the panel where the CTs are being installed.
Always use a properly rated voltage sensing device to confirm power is
off.
4.
Feed the CT cable into the panel through an appropriate punch-out with
an approved strain relief.
5.
Strip the plastic sheaths back on the cable to an appropriate length to
expose the wire pairs. Cut and strip the CT leads and wire pair leads to
an appropriate length. Crimp the CT leads to the wire pairs for each
meter point.
6.
When using solid-core CTs, remove the feed wire from the circuit
breaker, place the CT over the wire, and reconnect to the circuit
breaker. Ensure that the arrow on the CT label is pointing in the
direction of the energy flow (toward the load).
7.
When using split-core CTs, separate the halves of the CT and place the
CT over the wire to the circuit breaker. Ensure that the CT is facing the
source as shown on the label. Install cable ties to ensure that the CT
halves are held together securely.
8.
Repeat steps 5 to 7 for the remaining CTs.