15
PIPEMASTER™ Model PFM816
92-1412 Rev. 150925
STEP ‘B’ - ADJUSTING THE INNER BEVEL TOOL HOLDER ASSEMBLY
1.Before any adjustment can be made, all hex screws must be loosened.
2.Rotate axial adjustment screw to adjust tool holder height and after
adjustment is done tighten all hex screws.
6.Take this measurement for Step ‘C’.
3.Adjust this height to match
measurement taken in
step ‘A’.
4.Use a feeler gauge to adjust this height. (Add the land thickness to the radius of the ‘j’
bevel minus the radius of the insert.) Add spacers to adjust accordingly.
Example: land thickness – insert 3.2mm + 1.2mm – 2.3 = 2.1mm
5.Tighten all hex screws.