Transition Networks
SISTM1040-262D-LRT
24-Hour Technical Support: 1-800-260-1312
International: 00-1-952-941-7600
13
Chapter 3 Hardware Installation
In this section, we will describe how to install the 16 10/100TX + 2 10/100/1000T/Mini-
GBIC Combo w/ X-Ring L2 Managed Industrial Switch and the associated installation
points.
3.1 Installation Steps
1. Unpack the Industrial switch
2. Check if the DIN-Rail is screwed on the Industrial switch or not. If the DIN-Rail is not
screwed on the Industrial switch, please refer to
DIN-Rail Mounting
section for DIN-
Rail installation. If users want to wall mount the Industrial switch, please refer to
Wall
Mount Plate Mounting
section for wall mount plate installation.
3. To hang the Industrial switch on the DIN-Rail track or wall.
4. Power on the Industrial switch. Please refer to the
Wiring the Power Inputs
section
for knowing the information about how to wire the power. The power LED on the
Industrial switch will light up. Please refer to the
LED Indicators
section for indication
of LED lights.
5. Prepare the twisted-pair, straight through Category 5 cable for Ethernet connection.
6. Insert one side of RJ-45 cable (category 5) into the Industrial switch Ethernet port
(RJ-45 port) and another side of RJ-45 cable (category 5) to the network device’s
Ethernet port (RJ-45 port), ex: Switch PC or Server. The UTP port (RJ-45) LED on
the Industrial switch will light up when the cable is connected with the network device.
Please refer to the
LED Indicators
section for LED light indication.
[NOTE]
Make sure that the connected network devices support MDI/MDI-X. If it does not
support, use the crossover category-5 cable.
7. When all connections are set and LED lights all show in normal, the installation is
complete.