2.0 Installing the Power Supply Printed Circuit Board
+
2.1 To position the Power Supply Printed Circuit Board
2.1.1 Locate the four (4) remaining
screw holsters
near
side A
and
side B
of the
platform
.
2.1.2 Set the
Power Supply Printed Circuit Board
on the
screw holsters
as shown.
2.2 To secure the Power Supply Printed Circuit Board
2.2.1. Align the
screw holes
of the
Power Supply Printed Circuit Board
with the
screw holsters
of
the platform.
Transition Networks
®
Lan Master TM T8 Assembly Instructions
Version 1.1
Page 7
Figure 2.0
Side A
Side B
Figure 2.1.2
✗
✓
Figure 2.2.1
Satisfi
Design