1.0 Installing the Circuit Network Board
+
+
1.1 To position the Circuit Network Board
1.1.1 Locate the five (5)
screw holsters
near
side A
and
side D
of the
platform
.
1.1.2. Slide the
Circuit Network Board
under the opening of
Side A
and set down on top of
screw
holsters
.
Transition Networks
®
Lan Master TM T8 Assembly Instructions
Version 1.1
Page 4
Screw
Holsters
Side D
Side A
Figure 1.0
Figure 1.1.1
Figure 1.1.2
Satisfi
Design